My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STORMWATER POLLUTION PREVENTION 02 1330-1 <br /> <br /> <br />SECTION 02 1330 <br />STORMWATER POLLUTION PREVENTION <br /> <br />PART 1 – GENERAL <br />1.01 WORK INCLUDED <br />A. Prohibit illicit discharge (non-rainwater) into the storm drain system. <br />B. Construct any and all necessary systems to eliminate contaminants from entering <br />the storm water system. <br />C. Clean up and control of work site materials, spoils and debris. <br />D. Removal of contaminants produced by the project. <br />E. The work shall include the provision of all labor, materials, equipment and <br />apparatus not specifically mentioned herein or noted on the plans, but which are <br />incidental and necessary to complete the work specified. <br />1.02 APPLICABLE PUBLICATIONS <br />A. California Regional Water Quality Control Board, San Francisco Bay Region, <br />Municipal Regional Stormwater NPDES Permit – Order No. R2-2015-0049, <br />NPDES Permit No. CAS612008 - November 19, 2015, or most current version. <br />B. California Storm Water Best Management Practice Handbooks: <br />1. Municipal <br />2. Industrial/Commercial <br />3. Construction Activity <br />C. C.3 Stormwater Technical Guidance Ver 5.0, June, 2016, or most current version. <br />D. California State Water Resources Control Board, Construction General Permit <br />CAS000002 Order No. 2010-0014 DWQ, or most current version (for sites greater <br />than 1 (one) acre). <br />1.03 QUALITY ASSURANCE <br />A. All work performed under this contract and all contractors and their associates <br />and/or employees are required to comply with all applicable storm water <br />regulations and to implement Best Management Practices (BMP’s) at all times. <br />B. A plan shall be submitted for the proposed control of contaminants entering the <br />storm water system. The plan must be approved by the Engineer prior to the <br />commencement of work.
The URL can be used to link to this page
Your browser does not support the video tag.