My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRENCHING & BACKFILL 02 2020-7 <br />F. The Engineer shall have the right to limit the amount of trench which is opened or <br />partially opened at any one time; and also to limit the amount of trench left <br />without backfill, at any one time. <br />G. No trench or holes shall be left open overnight. Use steel plates to protect open <br />trenches overnight. <br />H. Excavation for thrust blocks shall be neat to the line and dimensions shown or <br />called for on the plans. <br />I. Provide for dewatering trenches and excavations and subsequent control of <br />ground water, utilizing such pumps or other equipment as may be necessary to <br />control ground water and seepage until backfilling is completed. <br />3.02 GENERAL BEDDING <br />A. Utilities shall be laid on a firm layer of firm bedding material not less than four (4) <br />inches in depth as shown or as noted on the plans and detail drawings, except <br />that bedding shall not be required for utilities two (2) inches or less in nominal <br />diameter. Compact as specified herein. <br />B. Upon completion of bedding operations and, prior to the installation of pipe or <br />appurtenances, notify the Engineer who will then inspect the bedding layer. Pipe <br />laying shall not commence until the bedding has been approved. <br />3.03 GENERAL BACKFILLING <br />A. Backfill shall be as shown on the plans. Place in 6-inch maximum loose lifts to <br />one foot above pipe unless otherwise specified. Bring up evenly on each side, <br />and for the full length of the structure. Ensure that no damage is done to <br />structures or protective coatings thereon. Place the remainder of the backfill in 8- <br />inch maximum loose lifts unless otherwise specified. Compact each loose lift as <br />specified in Paragraph 3.04 "General Compaction" before placing the next lift. <br />Where unacceptable settlements occur in trenches and pits due to improper <br />compaction, excavate to the depth necessary to rectify the problem, then backfill <br />and compact the excavation as specified herein and restore the surface to the <br />required elevation. <br />B. No backfill shall be placed until the line has been inspected and approved for <br />backfilling. <br />3.04 GENERAL COMPACTION <br />A. Use hand-operated plate type vibratory or other suitable hand tampers in areas <br />not accessible to larger rollers or compactors. Be careful to avoid damaging <br />pipes and protective pipe coatings. Compaction shall be in accordance with the <br />following unless otherwise specified. If necessary, the Contractor's selected <br />equipment and construction procedure shall be altered, changed or modified in <br />order to meet the specified compaction requirements.
The URL can be used to link to this page
Your browser does not support the video tag.