My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRENCHING & BACKFILL 02 2020-9 <br />shall be adequately supported in place with walers and braces. Fill voids <br />between sheathing and trench wall with pea gravel. <br />B. Mandatory use of solid sheathing at designated locations shall not relieve the <br />Contractor of the responsibility to install sheathing at other locations required or <br />where necessary for safety of workmen or the general public. Excavations below <br />Bay Mud shall be accomplished between previously placed sheathing and <br />bracing in those areas where solid sheathing is required. The required bracing <br />and sheathing will be installed prior to excavating below braced elevation. <br />C. Material which is salvaged from the trench and stockpiled for later use as backfill, <br />shall be stored a minimum distance of 10 feet, but no less than 3 times the trench <br />depth from the edge of the excavation. <br />D. Sheathing shall be withdrawn only after backfill above the pipe has proceeded to <br />a height equal to or greater than 3/4 of the excavation depth. Bottom cross <br />bracing and walers may be left in place upon removal of the sheathing. Backfill <br />shall be brought to the level of the cross-braces before these are removed. <br />E. Install and extract the sheathing in a manner which will not disturb the line, <br />grade, backfill compaction or operation of the utility being installed or adjacent <br />utilities and improvements. <br />3.07 SPECIAL REQUIREMENT FOR BACKFILL IN BAY MUD CONDITIONS <br />A. Bay Mud, if used as backfill at the Contractor's option, shall be spread and dried <br />to optimum moisture content, then replaced in the trench to the same elevation <br />below grade as the existing Bay Mud, as directed. <br />B. Imported fill material, which has been salvaged from trench excavation for use as <br />select backfill, shall be stockpiled alongside the excavation unless otherwise <br />directed. Material shall not be stockpiled higher than four (4) feet and shall be <br />kept back from the trench a horizontal distance at least equal to the depth of <br />excavation. <br />C. All material excavated within the limits of work, not required as backfill, shall then <br />be transported and dumped or conditioned to optimum moisture content and <br />compacted as embankment at the site noted on the plans or as directed. <br />D. On-site native Bay Mud for use as backfill shall be conditioned by means of <br />watering or aeration as may be required to bring the material to the range of <br />moisture content satisfactory for compaction to project specification. <br />E. Prior to placing conditioned material as backfill, the material shall be thoroughly <br />and uniformly mixed to the satisfaction of the Engineer, and the moisture content <br />shall be within the allowable range for compaction to project specification. <br />Material which has dried to less than allowable moisture content shall be <br />reconditioned to an acceptable moisture content and re-mixed to the satisfaction <br />of the Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.