My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRENCHING & BACKFILL 02 2020-11 <br />B. If backfill has been placed, that is below the specified density, provide additional <br />compaction with subsequent retesting until successful compaction is achieved. <br />3.12 DUST ALLEVIATION AND CONTROL <br />A. Contractor shall be responsible for and shall provide pollution and dust <br />abatement and control measures satisfactorily during the course of the work. <br />B. The Contractor shall utilize reclaimed water, or dust palliatives, in compliance <br />with the City's Water Conservation Ordinance. <br />3.13 FINISH OPERATIONS <br />A. Pipes shall be laid to finished grades indicated on the plans. <br />B. Dispose of all surplus material or material unsuitable for filling or grading off the <br />site in a legal manner. <br />C. Satisfactorily restore any existing improvements, paving, landscaping, and other <br />utilities disturbed during the course of constructing the improvements. <br />D. Existing traffic markings and control devices damaged or disturbed during <br />construction shall be replaced or repaired to the satisfaction of the Engineer. <br /> <br />* * *
The URL can be used to link to this page
Your browser does not support the video tag.