Laserfiche WebLink
TRENCHING & BACKFILL 02 2020-11 <br />B. If backfill has been placed, that is below the specified density, provide additional <br />compaction with subsequent retesting until successful compaction is achieved. <br />3.12 DUST ALLEVIATION AND CONTROL <br />A. Contractor shall be responsible for and shall provide pollution and dust <br />abatement and control measures satisfactorily during the course of the work. <br />B. The Contractor shall utilize reclaimed water, or dust palliatives, in compliance <br />with the City's Water Conservation Ordinance. <br />3.13 FINISH OPERATIONS <br />A. Pipes shall be laid to finished grades indicated on the plans. <br />B. Dispose of all surplus material or material unsuitable for filling or grading off the <br />site in a legal manner. <br />C. Satisfactorily restore any existing improvements, paving, landscaping, and other <br />utilities disturbed during the course of constructing the improvements. <br />D. Existing traffic markings and control devices damaged or disturbed during <br />construction shall be replaced or repaired to the satisfaction of the Engineer. <br /> <br />* * *