PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lower Lateral Replacement Project 2025 Form CONTRACT <br /> Page 4 <br />failure to make prompt payment to its employees, subcontractors, or suppliers or to <br />correct rejected work; disregard of laws, regulations, ordinances, rules, or orders of any <br />public agency with jurisdiction over the Project; lack of financial capacity to complete the <br />Work within the Contract Time; or responsibility for any other material breach of the <br />Contract requirements. If City terminates the Contract for cause after Work has <br />commenced pursuant to a Notice to Proceed, City will only owe Contractor payment for <br />the Work satisfactorily performed before Contract termination. Otherwise, City will have <br />no further obligation to Contractor. <br /> <br />12. Dispute Resolution. Any dispute arising under or related to this Contract is subject to the dispute <br />resolution procedures of Public Contract Code §§ 9204 and, when applicable, 20104 et. seq., <br />which are incorporated by reference. <br /> <br />13. Waiver. A waiver by City of any breach of any term, covenant, or condition in this Contract will <br />not be deemed a waiver of any subsequent breach of the same or any other term, covenant, or <br />condition contained herein, regardless of the character of any such breach. <br /> <br />14. Warranty. Contractor guarantees and warrants the Work and the materials used or provided for <br />the Project for a period of one year, beginning upon City’s acceptance of the Work for the Project <br />as complete (“Warranty Period”). During the Warranty Period, upon notice from the City of any <br />defect in the Work or the materials, Contractor must, at its sole expense, promptly repair or <br />replace the defective Work or materials, including repair or replacement of any other Work or <br />materials that is or are displaced or damaged during the warranty work, excepting any damage <br />resulting from ordinary wear and tear. <br /> <br />15. Worksite Conditions. <br /> <br />15.1 Clean and Safe. Contractor must maintain the Work site and staging and storage areas <br />in a clean and neat condition and must ensure it is safe and secure. On a daily basis the <br />Contractor must remove and properly dispose of debris and waste materials from the <br />Work site. <br /> <br />15.2 Inspection. Contractor will make the Work accessible at all times for inspection by the <br />City. <br /> <br />15.3 Hazardous Materials. Unless otherwise specified in the Contract documents, this <br />Contract does not include the removal, handling, or disturbance of any asbestos or other <br />hazardous materials, as identified by any federal, state, or local law or regulation. If <br />Contractor encounters materials on the Project site that Contractor reasonably believes <br />to be asbestos or other hazardous materials, and the asbestos or other hazardous <br />materials have not been rendered harmless, Contractor may continue Work in unaffected <br />areas reasonably believed to be safe, but must immediately cease Work on the area <br />affected and report the condition to City. No asbestos, asbestos-containing products or <br />other hazardous materials may be used in performance of the Work. <br /> <br />15.4 Utilities, Trenching and Excavation. Pursuant to Government Code § 4215, which is <br />incorporated by reference herein, if, during the performance of the Work, Contractor <br />discovers utility facilities not identified by City in the Contract documents, Contractor must <br />immediately provide written notice to City and the utility. In performing any excavations or <br />trenching work, Contractor must comply with all applicable operator requirements in <br />Government Code sections 4216 through 4216.5. If the trenching or excavation extends <br />deeper than four feet below the surface, then it must also comply with Public Contract <br />Code § 7104, which is incorporated by reference herein. <br /> <br />16. Records. Unless otherwise specified in Exhibit A, Contractor must maintain and update a <br />separate set of as-built drawings while the Work is being performed, showing changes from the