My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANITARY SEWERS 02 7300-17 <br /> <br />Pipe <br />Diameter <br />(inches) <br /> Specification Time for Length Shown (Minutes : Seconds) <br />100ft 150ft 200ft 250ft 300ft 350ft 400ft 450ft <br />8 7:34 7:34 7:34 7:34 7:36 8:52 10:08 11:24 <br />10 9:26 9:26 9:26 9:53 11:52 13:51 15:49 17:48 <br />12 11:20 11:20 11:24 14:15 17:05 19:56 22:47 25:38 <br />15 14:10 14:10 17:48 22:15 26:42 31:09 35:35 40:04 <br />18 17:00 19:13 25:38 32:03 38:27 44:52 51:16 57:41 <br />21 19:50 26:10 34:54 43:37 52:21 61:00 69:48 78:31 <br />24 22:47 34:11 45:34 56:58 68:22 79:46 91:10 102:33 <br />Use time values in Uni-Bell B-6 for sizes not shown. <br />4. Video Inspection <br />b. The complete job is ready for television inspection when the following <br />work has been completed: <br />i. All sewers pipelines are installed and backfilled. <br />ii. All structures are in place, all channeling is complete and pipelines <br />are accessible from structures. <br />iii. All other underground facilities, utility piping and conduits are <br />installed. <br />iv. Final street grading is complete and ready for asphaltic concrete <br />surfacing. <br />v. Pipelines to be inspected have been preliminarily balled and flushed <br />or cleaned by a high pressure cleaner. <br />vi. Final leakage test has been completed and approved. <br />vii. Sewer pipelines and structures have been cleaned a maximum of <br />thirty (30) minutes before the inspection is to take place. <br />viii. Flood and drain the sewer system just prior to video inspection. <br />When the above work is completed, the CONTRACTOR shall arrange with <br />the ENGINEER for the video inspection. <br />c. Sanitary sewer line shall be inspected internally by television as outlined <br />below. Video inspections shall conform to Section 02 7320 of these <br />specifications. <br />d. The following observations from television inspections shall be <br />considered defects in the construction of new sewer pipelines and shall <br />require correction prior to project completion:
The URL can be used to link to this page
Your browser does not support the video tag.