Laserfiche WebLink
FLOW BYPASS SYSTEMS 02 7400-2 <br />defined by the ENGINEER that may occur during a rainstorm. <br />3. If pumping is required on a 24-hour basis, engines shall be equipped in a manner to <br />keep noise to a minimum. All pumps shall be on-line, isolated by individual valves, <br />and be ready for immediate use in the event of an emergency or breakdown of an on- <br />line pump. <br />4. There shall be 100% redundant pump ready for immediate use in the event of an <br />emergency or breakdown of any of the service connection pumps. Each pumping <br />location shall have provisions for immediate installation of a redundant pump without <br />shutting the system down. <br />5. Bypass pumping system shall be of adequate size to convey the required flow without <br />causing upstream pipelines to surcharge to more than 24 inches above the crown of <br />the pipeline and 3 feet below the rim elevation. <br />6. Provide onsite portable lights for emergency use only. <br />7. Provide standby generation facilities for emergency use if pumps are equipped with <br />electric motors. Standby generators shall be noise-rated for residential zones, meet <br />air quality exhaust criteria of BAAQMD, as applicable, and shall meet the City’s <br />ordinances. <br />1.02 SUBMITTALS <br />A. Contractor shall submit a bypass pumping/piping plan and an emergency plan for each <br />bypass setup. The bypass pumping/piping plans are required for mainline bypass and <br />shall include: <br />1. A site plan showing dimensions, layout and list of equipment on each site and how the <br />facilities will be protected from public access during use. <br />2. Detailed description of each bypass system including connection, testing, operation, <br />alarm and control functions, and disconnection. <br />3. Contingency plans for power or equipment failure shall also be included where pumps <br />are used. <br />4. Schematic Map showing route of discharge, discharge locations, areas to be fenced, <br />and where and how discharge piping will be hardened to allow traffic access. <br />B. Where pumping is required, submit complete information and calculations on pumping <br />system to meet or exceed peak flow conditions. Calculations shall show the performance <br />of pumps (where used) against friction and minor losses in each bypass system. <br />C. Where standby generators are required, submit complete information and calculations on <br />generation system. <br />1.03 QUALITY ASSURANCE <br />A. The Contractor is responsible for the operation and maintenance of the bypass systems. <br />These systems will operate 24-hours a day for 7 days a week for as long as bypassing is <br />necessary.