My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.07.21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.07.21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 10:11:44 AM
Creation date
7/22/2025 10:02:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 10 <br />mailing of notice of the Public Hearing, and establishing procedures for <br />considering objections to the proposed water rates. <br />CEQA: <br />This is not a project under California Environmental Quality Act (CEQA) <br />6.G.Resolution for Fiscal Year 2025-2026 Roadway Pavement Management <br />Program use of Senate Bill 1 (SB 1) funds <br />Recommendation: <br />Adopt a resolution identifying a list of paving projects for Fiscal Year 2025-2026 <br />funded by SB 1: The Road Repair and Accountability Act of 2017, in accordance <br />with the Streets and Highways Code Section 2032 for the Road Maintenance and <br />Rehabilitation Account (RMRA). <br />CEQA: <br />This is not a project under the California Environmental Quality Act (CEQA) <br />6.H.Resolution approving the City’s updated Sewer System Management Plan <br />Recommendation: <br />Adopt a resolution approving the City’s updated Sewer System Management Plan <br />(SSMP) and authorize the Public Works Services Director to revise the SSMP as <br />required before the next six-year SSMP update. <br />CEQA: <br />This is not a project under California Environmental Quality Act (CEQA) <br />6.I.Award of contract to Cratus, Inc. for the Maple Street Sewer Interceptor 60-Inch <br />Extension Project <br />Recommendation: <br />By motion, accept Basset Engineering’s request to withdraw their lowest bid and <br />award the contract for the Maple Street Sewer Interceptor 60-Inch Extension <br />Project to the second lowest responsive and responsible bidder, Cratus, Inc. for <br />their responsive and responsible bid of $1,897,000, approve and authorize the <br />City Manager to execute the standard form construction contract documents, <br />and authorize the City Manager to increase the contractor amount, if necessary, <br />up to 10 percent of the amount awarded, for a total amount not to exceed <br />$2,086,700. <br />CEQA: <br />The California Environmental Quality Act (CEQA) provides a statutory exemption <br />from environmental review for the installation of new pipeline less than one mile <br />in length within a public street or highway or any other public right-of-way <br />4
The URL can be used to link to this page
Your browser does not support the video tag.