Laserfiche WebLink
ELEMENT 5 –DESIGN/PERFORMANCE PROVISIONS <br /> <br />Sewer System Management Plan Audit (8/2/21 to 8/2/24) Page 26 of 47 <br />ELEMENT 5 – DESIGN AND PERFORMANCE PROVISIONS <br />5.1. UPDATED DESIGN CRITERIA AND CONSTRUCTION STANDARDS REQUIREMENTS 8 <br />“The Plan must include the following items as appropriate and applicable to the Enrollee’s system.” <br />“Updated design criteria, and construc<on standards and specifica<ons, for the construc<on, installa<on, repair, <br />and rehabilita<on of exis<ng and proposed system infrastructure components, including but not limited to pipelines, <br />pump sta<ons, and other system appurtenances. If exis<ng design criteria and construc<on standards are deficient <br />to address the necessary component-specific hydraulic Capacity as specified in sec<on 8 (System Evalua<on, <br />Capacity Assurance and Capital Improvements) of this ARachment, the procedures must include component-specific <br />evalua<on of the design criteria.” <br />5.2. PROCEDURES AND STANDARDS REQUIREMENTS <br />“Procedures, and standards for the inspec<on and tes<ng of newly constructed, newly installed, repaired, and <br />rehabilitated system pipelines, pumps, and other equipment and appurtenances.” <br /> <br />FINDINGS (Element 5: Analysis) <br />SSMP Element AT. D-5 <br />COMPLIANCE <br />q Assess element narra[ve and improve as necessary for 2025 SSMP Update. <br /> <br />IMPLEMENTATION <br />q None <br /> <br /> <br /> <br /> <br />8 See Attachment D-5.1 of Reissued WDR (page D-5) <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 196 of 317