My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16341
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 1:50:17 PM
Creation date
7/22/2025 1:47:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
7/21/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/22/2025 1:50 PM
Modified:
7/22/2025 1:50 PM
Text:
https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/wqo_2022-0103-dwq.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ELEMENT 10– INTERNAL AUDITS <br /> <br />Sewer System Management Plan Audit (8/2/21 to 8/2/24) Page 39 of 47 <br />ELEMENT 10 – INTERNAL AUDITS <br />10.1. REQUIREMENTS 13 <br />“The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the <br />Enrollee to comply with sec<on 5.4 (Sewer System Management Plan Audits) of this General Order.” <br />10.2. SPECIFICATIONS (SEWER SYSTEM MANAGEMENT PLAN AUDITS) <br />“The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementa<on of its Plan, <br />at a minimum frequency of once every three years. The audit must be conducted for the period aAer the end of the <br />Enrollee’s last required audit period. Within six months aAer the end of the required 3-year audit period, the Legally <br />Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the <br />requirements in sec<on 3.10 (Sewer System Management Plan Audit Repor<ng Requirements) of ARachment E1 of <br />this General Order. Audit reports submiRed to the CIWQS Sanitary Sewer System Database will be viewable only to <br />Water Boards staff. The internal audit shall be appropriately scaled to the size of the system(s) and the number of <br />spills. The Enrollee’s sewer system operators must be involved in comple<ng the audit. At minimum, the audit must: <br />• Evaluate the implementa<on and effec<veness of the Enrollee’s Sewer System Management Plan in <br />preven<ng spills. <br />• Evaluate the Enrollee’s compliance with this General Order. <br />• Iden<fy Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters <br />of the State; and <br />• Iden<fy necessary modifica<ons to the Sewer System Management Plan to correct deficiencies. <br />• The Enrollee shall submit a complete audit report that includes: <br />• Audit findings and recommended correc<ve ac<ons. <br />• A statement that sewer system operators’ input on the audit findings has been considered; and <br />• A proposed schedule for the Enrollee to address the iden<fied deficiencies.” <br /> <br /> <br /> <br /> <br /> <br />13 See Attachment D-10 of Reissued WDR (page D-10) <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 209 of 317
The URL can be used to link to this page
Your browser does not support the video tag.