Laserfiche WebLink
Appendix 1 - Compliance Evaluation Inspection Report(WDID=#2SSO10168 Page 9/24 <br /> <br />6. TASK B2 – Onsite Field Inspection: Sewer Pump Station #10 <br /> <br />Task B2 of the inspection included review of City CCTV operations and interviewing field staff at (see individual photos, 1-20 below). <br /> <br /> <br />Task B2 (Photo 1): View of Pump Station #10 signage (without <br />City phone number) mounted on the side of the motor control <br />center (MCC) building; station located approximately 20 feet <br />from large surface water body. <br />Task B2 (Photo 2): Inspection of pump station with City Utilities <br />Specialist; City one additional Specialist on staff and an outside <br />contractor available for responding to emergencies. <br /> <br />Task B2 (Photo 3): Inspection of MCC building/controls. <br /> <br />Task B2 (Photo 4): Inspection of operator log sheet in MCC. <br /> <br />APPENDIX 1 (Page 9) <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 227 of 317