Laserfiche WebLink
5. ELEMENT 5 (Design and Performance Provisions) <br /> <br /> <br />Attach. D-5 (Design and Performance Provisions) <br />SSMP Implementation <br />o KPI D-5(a) o Does the Agency implement its current design <br />and construction standards, specifications, and <br />inspection procedures? <br /> <br />Element Review Frequency/Tasks: <br />o Annual review <br />SSMP Effectiveness <br />o KPI D-5(b) o Are existing Agency design and construction <br />standards, specifications, and inspection <br />procedures adequate for the collection system? <br />o Annual review of the Agency standards and <br />procedures for acceptance and testing of new <br />infrastructure? <br /> <br />o % of new infrastructure accepted vs inspected <br /> <br />Element Review Frequency/Tasks: <br />o Annual review <br /> <br /> <br />o Annual review <br /> <br /> <br /> <br />o Annual review <br />SSMP Resilience <br />o KPI D-5(c) o None o None <br /> <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 298 of 317