My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Schaaf and Wheeler Consulting Civil Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 Schaaf and Wheeler Consulting Civil Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 10:28:58 AM
Creation date
7/30/2025 10:28:49 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Shores Sea Level Rise Protection
RMP File Number
304
Date
7/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 07-08-25 VR <br />(i) Procure or obtain any equipment, system, or service that uses covered <br />telecommunications equipment or services as a substantial or essential component <br />of any system, or as critical technology of any system; <br />(ii) Enter into, extend, or renew a contract to procure or obtain any equipment, <br />system, or service that uses covered telecommunications equipment or services as a <br />substantial or essential component of any system, or as critical technology of any <br />system; <br />(iii) Enter into, extend, or renew contracts with entities that use covered <br />telecommunications equipment or services as a substantial or essential component <br />of any system, or as critical technology as part of any system; or <br />(iv) Provide, as part of its performance of this Agreement, subcontract, or other <br />contractual instrument, any equipment, system, or service that uses covered <br />telecommunications equipment or services as a substantial or essential component <br />of any system, or as critical technology as part of any system. <br />(c) Exceptions. <br />(1) This clause does not prohibit the Contractor from providing— <br />(i) A service that connects to the facilities of a third-party, such as backhaul, roaming, <br />or interconnection arrangements; or <br />(ii) Telecommunications equipment that cannot route or redirect user data traffic or <br />permit visibility into any user data or packets that such equipment transmits or <br />otherwise handles. <br />(2) By necessary implication and regulation, the prohibitions also do not apply to: (i) <br />Covered telecommunications equipment or services that: <br />i. Are not used as a substantial or essential component of any system; and <br />ii. Are not used as critical technology of any system. <br />(ii) Other telecommunications equipment or services that are not considered covered <br />telecommunications equipment or services. <br />(d) Reporting requirement. <br />(1) In the event the Contractor identifies covered telecommunications equipment or <br />services used as a substantial or essential component of any system, or as critical <br />technology as part of any system, during the performance of the Agreement, or the <br />Contractor is notified of such by a subcontractor at any tier or by any other source, <br />the Contractor shall report the information in paragraph (d)(2) of this clause to the <br />recipient or subrecipient, unless elsewhere in the Agreement are established <br />procedures for reporting the information. <br />ATTY/AGR.2025.172/Schaaf and Wheeler Consulting Civil Engineers (Redwood Shores Sea Level Rise Protection) (Page 33 of 36)
The URL can be used to link to this page
Your browser does not support the video tag.