My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2025-033903 STMMA 2950 Bay Road
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc2025-033903 STMMA 2950 Bay Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 12:40:09 PM
Creation date
9/2/2025 12:39:35 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2025-033903
Rec Date
7/2/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVERFLOW DRAIN <br />r2" MIN. <br />■ <br />6" MIN. � j � j <br />� <br />8" SOLID PVC RISER <br />0 <br />REATMENT SOIL, <br />• <br />TE 3 <br />HICK CONCRETE <br />--� -�a <br />TH WAYS <br />ALTRANS CLASS <br />ERMEABLE ROCK <br />4" DIA. PERFORATED SLOPED <br />UNDERDRAIN (SLOPE AT 0.5%) WITH <br />NOTES: PERFORATIONS 60' APART ON PIPE <br />1. SEE LANDSCAPE PLANS & SPECIFICATIONS FOR PLANTING MATERIALS WITHIN BIORETENTION <br />AREAS <br />2. PLACE 4" MIN. DIA. APPROVED NOYO COBBLE (OR APPROVED EQUIVALENT) FLUSH WITH <br />CHANNEL SURFACE AROUND ALL STRUCTURES WITHIN BIORETENTION AREA (DRAINAGE <br />BUBBLERS, OVERFLOW DRAINS, SIGNS, LIGHT POSTS, IRRIGATION BOXES, ETC.), EXTENDING <br />12" FROM EDGE OF STRUCTURE. <br />3. SOILS IN THE FACILITY SHOULD MEET BIOTREATMENT SOIL SPECIFICATIONS APPROVED BY <br />THE REGIONAL WATER BOARD (PER SAN MATEO COUNTY C.3 MANUAL). A MINIMUM <br />PERCOLATION RATE OF 5 INCHES/HOUR AND A MAXIMUM PERCOLATION RATE OF 10 <br />INCHES/HOUR ARE REQUIRED. PLANTING SOIL LAYER SHOULD BE AT LEAST 18 INCHES DEEP. <br />CONTRACTOR TO SUBMIT MATERIAL CERTIFICATES SIGNED BY THE MATERIAL PRODUCER, <br />CERTIFYING THAT SOIL COMPLIES WITH, OR EXCEEDS, SPECIFIED REQUIREMENTS. <br />4. EXPOSED PVC PIPE WITHIN BIORETENTION AREAS, SUCH AS OVERFLOW RISERS, SHALL BE <br />PAINTED BLACK. <br />5. NOYO COBBLES (4"-6" IN DIA.), OR APPROVED EQUIVALENT, SHALL BE PLACED IN A 2'X2' <br />AREA UNDER DOWNSPOUTS THAT SPILL AT GRADE. <br />FLOW-THROUGH PLANTER <br />BKF ENGINEERS EXHIBIT "B" <br />N. FIRST STREET <br />SUITE 600 STORMWATER CONTROL PLAN <br />SUIT <br />SAN JOSE, CA 95112 THE AGORA - 2950 BAY ROAD <br />(408) 467-9100 <br />www.bkf.com Drawn SH Checked DP Approved DP <br />Job No. 20201556 Date 12/20/2024 Sheet 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.