Laserfiche WebLink
Exhibit C <br />Inspection and Maintenance Checklist <br />Stormwater Treatment Measures <br />112 Vera Avenue Apartments <br />Redwood City, CA 94063 <br />Project Address & Cross Streets: <br />112 Vera Avenue <br />Redwood City, CA 94061 <br />Assessor's Parcel No.: <br />Property Owner: Lori Koester <br />Phone No.: -_(818)-905-3836 <br />Designated Contact: Lori Koester <br />Mailing Address: 20750 Venture Blvd.. <br />Suite 155 Woodland Hills, CA 91364 <br />The property contains two Modular Bioretention Basins, Vegetated or Rock Lined Swales, and <br />two Roadside Bioretention Basins as described below and as shown in the attached site plan: <br />■ Modular Bioretention Basins are located at the northeast and southwest side of the building. <br />• Vegetated or rock lined swales are located along the southwest edge of property. <br />■ Roadside Bioretention Basins are located at Vera Avenue street front. <br />I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the modular <br />bioretention basin and landscaping remains attractive in appearance. Table 1 shows the routine <br />maintenance activities, and the frequency at which they will be conducted. <br />No. <br />Table 1 <br />Routine Maintenance Activities for Modular Bioretention Basins <br />Maintenance Task <br />Remove obstructions, debris and trash from modular <br />bioretention basin area and dispose of properly. <br />2 Inspect modular bioretention basin to ensure that it drains <br />between storms and within five days after rainfall. <br />Frequency of Task <br />Monthly, or as needed after <br />storm events <br />Monthly, or as needed after <br />storm events <br />3 <br />Inspect inlets for channels, soil exposure or other evidence of <br />Monthly, or as needed after <br />erosion. Clear obstructions and remove sediment. <br />storm events <br />4 <br />Remove and replace all dead and diseased vegetation. <br />Twice a year <br />5 <br />Maintain vegetation and the irrigation system. Prune and weed <br />Before wet season begins, or as <br />to keep modular bioretention basin neat and orderly in <br />needed <br />appearance. <br />6 <br />Check that mulch is at appropriate depth (3 inches per soil <br />Monthly <br />specifications) and replenish as necessary before wet season <br />begins. <br />7 <br />Inspect modular bioretention basin using the attached <br />inspection checklist. <br />Monthly, or after large storm <br />events, and after removal of <br />accumulated debris or material <br />ATTY/AGR.2025.038/112 Vera Ave, L.P. (112 Vera Ave) (Page 14 of 23) <br />