My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2025 2:44:53 PM
Creation date
10/14/2025 2:42:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/13/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />ANALYSIS <br />The project was awarded with City Manager authorization to increase the contract amount up to 10% to <br />address the need for any change orders identified during the course of work. The project has been <br />completed in accordance with all plans and specifications provided by the City. <br />Change orders were authorized to address the need for additional labor and materials due to changes in <br />scope that were required to accommodate the City’s needs. The change orders resulted in an additional <br />11 days of total contract time. The table below outlines the total cost changes for the project. <br />Contractor Base Bid Change Orders Total % Increase Total Days Added <br />Onpoint Construction $303,125 $13,743 4.5%11 <br />Figure 2 and Figure 3 below show the Fair Oaks Community Center MPR Kitchen before and after the <br />renovation project. <br /> <br /> <br /> <br /> Figure 2: MPR kitchen before renovations Figure 3: MPR Kitchen after renovations <br />FISCAL IMPACT <br />This project is funded through Community Development Block Grant funding and funds from the FOCC <br />Facilities Upgrade and Improvements Program Account within the Capital Outlay Fund. Any contingency <br />funding needs were supplied by City’s Tenant Improvement Program Account of the Capital Outlay Fund. <br />BEFORE AFTER <br />7.C. - Page 2 of 3 <br />18
The URL can be used to link to this page
Your browser does not support the video tag.