My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2025-048126 Landscape Maintenance Agreement 2336 El Camino Real - 2 Lot Subdivision
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Landscape Maintenance Agreement
>
RecDoc2025-048126 Landscape Maintenance Agreement 2336 El Camino Real - 2 Lot Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 4:35:04 PM
Creation date
10/27/2025 4:34:33 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2025-048126
Rec Date
9/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been approved without the assurance that this Agreement would be executed by <br />Developer. <br />F. City and Developer desire to enter into an agreement pursuant to which <br />Developer will maintain the Improvements within the Maintenance Area as both are <br />depicted on Exhibit "B" <br />AGREEMENT <br />NOW, THEREFORE, in consideration of the faithful performance of the terms and <br />conditions set forth in this Agreement, the Parties hereto agree as follows: <br />1. Purpose. The purpose of this Agreement is to assure the maintenance, periodic <br />inspection, repair, safe operation and, if and when necessary, replacement of the <br />Improvements by Developer at its expense in accordance with the standards, including <br />the Maintenance Standards (defined in Section 4 below), set forth herein. <br />2. Improvements as a Benefit. Developer agrees that the Improvements will <br />materially benefit the Property and that Developer's maintenance, repair, safe operation <br />and, if and when necessary, replacement thereof in accordance with this Agreement is <br />necessary for approval of Developer's Parcel Map. <br />3. Developer's Responsibilities. In order to ensure the attractive and healthy <br />appearance of the landscaping; the attractive appearance, condition and safety of any <br />and all structures; and the efficient operation of all the Improvements, Developer will <br />undertake the following actions at its sole cost and expense: <br />3.1 Maintain, safely operate, periodically inspect, repair, resurface and, if and <br />when necessary, replace the Improvements identified in Exhibit "B"; <br />3.2 Perform all necessary service on maintenance equipment; and <br />3.3 Pay the electrical expense of operating the pedestrian light and irrigation <br />controller, upon the direct receipt of invoices for electrical service from Pacific Gas <br />and Electric. <br />In undertaking the foregoing actions, Developer will comply with the Maintenance <br />Standards described in Section 4 below and with industry and City standards applicable <br />to similar improvements. <br />4. Maintenance Standards. Developer, including its maintenance staff, contractors <br />and subcontractors, will comply with the following standards (collectively, "Maintenance <br />Standards") in connection with maintenance of the Improvements: <br />REV: 05-20-2516 <br />ATTY/AGR.2025.116/Carrasco & Associates (2336 EI Camino Real) (Page 2 of 13) <br />
The URL can be used to link to this page
Your browser does not support the video tag.