Laserfiche WebLink
GBI Builds on Plans and Projects inRedwood City <br />•El Camino Real Corridor Plan (2017) <br />•Redwood City Moves (2018) <br />•RWC Walk Bike Thrive (2022) <br />•Buffered Bicycle Lane Pilot on NB El Camino Real, Maple St to Jefferson Ave (2024) <br />•Protected Bicycle Lane Pilot on SB El Camino Real, Brewster to Madison(2026) <br />•Caltrans SHOPP Bike Safety Project, Shelby Lane to Brewster (2028-29) <br />•SamTrans Central El Camino Real Multimodal Plan (current) <br />11