Laserfiche WebLink
City of Redwood City Water Rate Study8C. Fire Service AllocationsAllocation of Fire Flow Demand Costs Public Versus PrivateAsset Values of Value Fire Flow Max DayDemand EquivalentType Assets Allocation Demand¹ Demand²Service LineCount Factor Connections AllocationPressure¹ $9,701,974 77% 52% 48%HydrantsStorage²$2,827,336 23% 16%84%6"2,385 111.31 265,477 80.7%$12,529,310 100%Existing Private Service LinesAllocation of Water Distribution43.7% 56.3%1" 0 1.00 0 ¹Allocation of fire flow and maximum day demand calculated based on Tab2"170 6.191,052in 2011 City of Redwood City Water System Master Plan3"30 17.98539²Allocation of fire flow and maximum day demand calculated based on Tab4"146 38.325,595in 2011 City of Redwood City Water System Master Plan6"183 111.31 20,3708"126 237.21 29,888Demand TypePublic Fire Private Fire Max Day10"8 426.583,413Demand Demand Demand²12"4 689.042,756Fire Flow Demand80.7% 19.3%66363,613 19.3%Allocation of Water Districtio35.3% 8.5% 56.3%Total 3,048 329,090 100.0%HF&H Consultants, LLC 6/16/2025 1:45 PMRWC_Water_Model_6Jun2025.xlsx 8C. Fire Service AllocationsATTY/RESO.0109/CC RESO WATER RATES - EXHIBIT A REV: 11-05-25 MI