My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.11.24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.11.24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 12:31:30 PM
Creation date
11/25/2025 12:28:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
11/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br />IQHQ and HSR also plan to utilize the City’s Affordable Housing Incentive Program, once adopted and in effect, to further <br />streamline the path to construction. We appreciate the City’s collaboration and creative problem-solving in addressing <br />current economic realities while maintaining community interests and the original intent of the entitled project. The <br />following is a summary of the proposed modifications: <br />. <br /> <br />1. Changing Commercial Obligation from providing affordable units to providing a combination of <br />affordable units and paying an affordable housing impact fee: At the time the project was originally <br />approved, market conditions supported delivering the commercial obligation as on-site affordable units on <br />Parcel A, D and F, which was an alternative means of compliance to the payment of an impact fee. The affordable <br />housing project on Parcel F was completed and 16 of those units satisfy a portion of the commercial obligation. <br />Given the changed economic environment that has the delayed the start of Parcel A and D, HSR and IQHQ <br />propose reverting to paying an impact fee of $5,822,001 to satisfy the remaining commercial requirement, which <br />is an option allowed under the City’s Affordable Housing Ordinance. The economic rationale for this approach <br />is that a one-time impact fee is less of an impact on ongoing project financials. The impact fee further provides <br />the City with immediate resources to invest in other affordable housing initiatives. The fee would be paid to <br />prior to obtaining the final certificate of occupancy for commercial Building C, which is anticipated by February <br />1, 2026. <br /> <br />2. Revised State Density Bonus Request: We propose revisions to the State Density Bonus Law Request, <br />originally approved at the City Council in November 2020. These revisions involve the redistribution of land <br />areas to more optimally allocate density bonuses between Parcels A and D. The modifications also include <br />satisfying State Density Bonus Law with Very-Low Income units (a lower level of affordability than previously <br />proposed) and reclassifying prior concessions as waivers to allow additional concessions. HSR will request new <br />concessions to reduce the private open space requirement on Parcel D from 125 sq. ft to 104 sq. ft. per unit, and <br />modification of the City’s requirement that affordable units be of comparable square footage to market rate <br />units. The attached proposed revision of the original State Density Bonus Request provides detailed information <br />on the proposed changes. The Project will continue to deliver a total of 540 units, 39 of which have been <br />completed off site. Parcel A will provide 252 units and Parcel D will provide 249 units, as originally envisioned. <br /> <br />3. Revised Affordable Housing Plan: The Affordable Housing Plan would be updated to reflect the new number <br />of affordable units in Parcels A and D, as modified by the requested modifications summarized in #1 and #2. <br />HSR is also seeking approval to use Alternative 2 of the Concurrent Occupancy options to satisfy the City’s <br />concurrent construction requirements. HSR is planning to stagger the construction starts of Parcels A and D <br />by a few months to more efficiently mobilize construction crews between the two sites. The Affordable Housing <br />Plan will also be updated to include the City’s Local Preference Program, which will grant residents and workers <br />preference for the new affordable units to prevent displacement. <br /> <br />4. Façade Revisions: HSR is committed to delivering the residential buildings with the same high-quality design <br />and aesthetic appeal as originally envisioned. Through collaborative discussions with general contractors and <br />design consultants, HSR has identified several opportunities to enhance construction efficiencies related to the <br />building façades. HSR then coordinated closely with City Staff to ensure that any proposed revisions would <br />maintain the original design intent from the public perspective. As a result, the Project architect, WRNS, has <br />prepared a comprehensive package, included in this submission, detailing these proposed minor revisions. <br />These revisions are specifically designed to identify similar but more cost-effective materials and construction <br />methods, without compromising the original design intent, quality, or visual appeal. HSR intends to retain WRNS, <br />the design architect for both the commercial and residential buildings, throughout the construction phase, <br />ensuring design continuity and a seamless transition. <br /> <br /> <br />We have attached the following supporting exhibits to supplement the request: <br /> <br />1. WRNS Façade Revision Package <br />8.B. - Page 23 of 120 <br />186
The URL can be used to link to this page
Your browser does not support the video tag.