My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.11.24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.11.24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 12:31:30 PM
Creation date
11/25/2025 12:28:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
11/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction-Related Activities <br />83. Verification for Dimensions -All dimensions, including building location on the site, setbacks, <br />building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided to the <br />Building Inspector for review and approval. [COA][BUILDING] <br />84 . Sales and Use Taxes -Applicant shall use good faith efforts to register with the Board of <br />Equalization to create an ID prior to project construction and operation. This maximizes the City's <br />allocation of sales and use taxes associated with project construction . Contact Nancy Murguia, <br />Finance Department, at (650) 780-7097 or nmurguia@redwoodcity.org. [COA][FINANCE] <br />85. Hours of Construction -On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. <br />Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere <br />to the City's Noise Ordinance. If possible, the noisiest construction activities would be scheduled <br />for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] <br />86. Construction Sign -Prior to the start of any construction work, including demolition, install at least <br />one 36" x 48" (minimum) construction sign in a visible location along the project frontage for the <br />duration of construction. The sign shall include, at minimum, the following information: project <br />name & address, elevation or rendering, construction manager (name, phone number), anticipated <br />completion (season, year), and the City's permitting website http:ljpermits.redwoodcity.org <br />[COA][PLANNING] <br />87. Construction Meetings-The applicant is required to contact the Permit Counter (650.780.7350) to <br />schedule the following meetings prior to or during construction. [COA][BUILDING] <br />a. Pre-Construction -After City permits are issued, but prior to start of construction, <br />schedule a pre-construction meeting with Engineering, Building, Fire, and Planning <br />staff to discuss the inspection process and requirements for construction and site <br />work. The applicant shall arrange for the attendance of the owner, developer, <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. <br />b. For Affordable units on-site -Interior Finishes & Amenities -After sheetrock <br />inspection but prior to installation, contact the Project Planner and Housing Staff to <br />verify, to the City's satisfaction, that all interior finishes and amenities in the <br />affordable units are equivalent to amenities used in market rate units. <br />88. Materials Mock-Up -Prior to final foundation inspection, prepare a mock-up for each building that <br />is outdoors, readily accessible, and will remain intact until the project has reached substantial <br />completion. Each mock-up should include all project colors and materials, windows for the base and <br />top, balconies, lighting, and architectural details, as well as construction details, such as the weep <br />screed, to understand how the design addresses them. Then schedule a mock-up meeting with the <br />Planning Division for final review and approval of the project details. Submit an updated colors and <br />materials board or details if any changes are made as a result of the mock-up meeting. <br />[COA][PLANNING] <br />89. Certification Letters -Prior to final inspection, submit certification letters from the following <br />architects verifying that the project, as constructed, complies with approved plans. After the <br />certification letter has been submitted, the project planner will also confirm substantial compliance <br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT-ENTITLEMENT <br />REV: 11-03-2020 PR <br />Page 35 of 38 <br />RESO. NO. 15908 <br />MUFF NO. 601 <br />8.B. - Page 116 of 120 <br />279
The URL can be used to link to this page
Your browser does not support the video tag.