Laserfiche WebLink
•New requirements for concrete lined channels <br />7 of 14 <br />Revisions to Chapter 27A: Stormwater <br />Management and Discharge Control Program <br />–A technical report that <br />demonstrates zero additional <br />loading on creek walls <br />–Minimum 10 feet of space <br />between the top of channel <br />wall and nearest structure <br />Credit: City of Redwood City – Concrete Lined Channel behind <br />180 Harrison Ave <br />Concrete Lined Channel with Bracing <br />•Existing structures subject to <br />Article 33 of the Zoning <br />Ordinance