Laserfiche WebLink
Docuega Envelope ID: 525D1C4a-H1 W-06.11-AC20-EP4EF437aeA6 <br />xvii. Subcontractor to include new copper pipes to <br />restore water pressure. <br />b. Subcontractor to replace toilet <br />c. Subcontractor to replace sink faucet <br />d. Subcontractor to install (1) new LED light fixture <br />e. subcontractor to install (i) GFCI outlet and (1) light switch <br />f. Subcontractor to Re -Grout and seat the existing tite floor. <br />g. Subcontractor to replace (1) failed vanity <br />h. Subcontractor to replace (1) failed exhaust fan. <br />Task 8 Bedrooms 1-4 Light Fixtures <br />a. Install (1) new low profile LED light fixture and (1) dimmer <br />switch in each bedroom (4) total. <br />$700 <br />Task 9 Bedroom 3 Repairs <br />a. Subcontractor to repair ceiling cracks <br />b. Subcontractor to prep and paint the entire room. Assume (1) <br />coat of primer and (2) coats of paint. <br />$760 <br />Task 10 Hallway Repairs <br />a. Repair ceiling and watt cracks and paint to match. <br />1). Replace existing lighting (4) %Ytth LED's. <br />$]200 <br />Task 11 Laundry Room Repairs <br />a. Inspect and Repair plumbing drain for washer. <br />b. Install missing, sheetrock and paint to match. <br />$850 <br />permit Allowance <br />$3,500 <br />Contractor General Requirements <br />$9,670 <br />$52,770 <br />REV; 10-02-25 LF <br />ATTY/AGR.2025.255lHabltat for Humanity (142 Center (Moreno) CDBG Loan Agreement) (Page 17 of 21) <br />