My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.12.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.12.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 11:32:33 AM
Creation date
12/11/2025 11:27:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
12/8/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
771
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orange text indicates modified timeline Page 1 of 11 <br />Attachment B – Transportation Impact Fee Project List 2025 <br />* Link to GIS Mapping of Projects <br />Project Name/General <br />Location, where <br />applicable <br />Description CIP <br />(Y/N) <br />Estimated <br />Start Year <br />Total Project <br />Costs (Including <br />All Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount <br />Funded w/ Fee <br />Revenue <br />Multi-modal projects <br />El Camino Real and <br />Jefferson Ave <br />Intersection <br />Improvements- Vision <br />Zero project <br />Intersection geometry <br />improvements, adding median for <br />better pedestrian crossing, high- <br />visibility crosswalks, etc. <br />Y within 10 <br />years <br />$315,000 25%$78,750 <br />Broadway and Main <br />Street Intersection <br />Improvements-Vision <br />Zero project <br />Install intersection enhancements <br />including, but not limited to: <br />upgrading crosswalks, adjusting <br />median noses, installing leading <br />pedestrian interval, installing <br />retroreflective backplates, <br />installing ADA compliant curb <br />ramps, installing traffic calming <br />measures, and installing advance <br />limit lines. <br />Y within 5 years $1,080,000 25%$270,000 <br />Broadway and <br />Woodside Road <br />Intersection <br />Improvements-Vision <br />Zero project <br />Install intersection enhancements <br />including, but not limited to: <br />upgrading crosswalks, installing <br />pedestrian countdown heads and <br />push buttons, upgrading signal <br />heads and installing <br />retroreflective backplates, and <br />installing ADA compliant curb <br />ramps. <br />Y within 10 <br />years <br />$690,000 25%$172,500 <br />9.B. - Page 11 of 39 <br />516
The URL can be used to link to this page
Your browser does not support the video tag.