My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.12.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.12.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 11:32:33 AM
Creation date
12/11/2025 11:27:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
12/8/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
771
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orange text indicates modified timeline Page 7 of 11 <br />Attachment B – Transportation Impact Fee Project List 2025 <br />* Link to GIS Mapping of Projects <br />Project Name/General <br />Location, where <br />applicable <br />Description CIP <br />(Y/N) <br />Estimated <br />Start Year <br />Total Project <br />Costs (Including <br />All Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount <br />Funded w/ Fee <br />Revenue <br />Intersection Safety <br />Improvements <br />Specific improvements to be <br />determined. Funds will be used to <br />enhance safety elements at 25 <br />intersections identified in <br />Redwood City Walk Bike Thrive <br />Plan. <br />Y within 5 <br />years <br />various years <br />$6,250,000 25%$1,562,500 <br />Charter Street (Spring <br />Street to Middlefield <br />Road) <br />Install complete streets corridor <br />improvements. <br />Y within 10 <br />years <br />$545,000 25%$136,250 <br />Chestnut Street (Spring <br />Street to Heller Street) <br />Install complete streets corridor <br />improvements. <br />Y 10 to 20 years $1,520,000 25%$380,000 <br />Hoover Street (Fifth <br />Avenue to Eighth <br />Avenue) <br />Install complete streets corridor <br />improvements. <br />Y within 10 <br />years <br />$205,000 25%$51,250 <br />Middlefield Road (from <br />Woodside Road to <br />Douglas Avenue)-Vision <br />Zero project <br />Install complete streets corridor <br />improvements and Install corridor <br />enhancements between <br />Woodside Road and Charter <br />Street including, but not limited <br />to: upgrading lane lines, installing <br />retroreflective backplates, <br />installing traffic calming <br />measures, installing advanced <br />limit lines at intersections, and <br />installing bike lanes and green <br />pavement conflict markings. <br />Y 1-2 years <br />within 10 <br />years <br />$2,950,000 25%$737,500 <br />Broadway (El Camino <br />Real to Charter Street) <br />Install complete streets corridor <br />improvements. <br />Y within 10 <br />years <br />$7,370,000 25%$1,842,500 <br />9.B. - Page 17 of 39 <br />522
The URL can be used to link to this page
Your browser does not support the video tag.