Laserfiche WebLink
ATTACHMENT K <br />XII - K5 <br />REVISED: 12/8/25 <br />APPROVED: 12/8/25 <br />PARCEL MAP AND FINAL MAP <br />REQUIRED SUBMITTAL MATERIALS <br /> <br /> <br />MATERIALS <br />Include one electronic copy of required <br />information, studies, and reports below. Include <br />additional copies as specified. <br />☐ Conditional approval letter <br />☐ Approved tentative map <br />☐ Geotechnical soils report <br />☐ <br />Three blueline or blackline prints of <br />draft conditions, covenants, and <br />restrictions <br />☐ Designation of subdivision units (if any) <br /> <br />PARCEL MAP AND FINAL MAP <br />Include one electronic copy and three complete <br />blueline or blackline prints. All plans should be <br />drawn to scale and completed dimensioned. <br />☐ SURVEYS AND MONUMENTS <br />____ 1. Based on a field survey prepared <br />by a California-registered civil <br />engineer or land surveyor <br />____ 2. All found monuments, property <br />lines, centerlines of streets, and <br />alleys adjoining or within the <br />subdivision tied into the survey <br />____ 3. Engineer shall set sufficient <br />monuments so that survey can be <br />readily retraced <br />____ 4. At least one exterior boundary <br />line is monumented. Additional <br />monuments are set as required <br />by City Engineer <br />☐ SUPPLEMENTARY DOCUMENTS <br />____ 1. Traverse sheet showing: <br />a. Mathematical computations <br />b. Closure Calculations <br />c. Area Calculations <br />____ 2. Field notes showing: <br />a. References <br />b. Ties <br />c. Locations <br />d. Elevations <br />e. Other data relating to <br />monuments and benchmarks <br />____ 3. Statement stating that: <br />a. Any improvements completed <br />prior to the filing of the map <br />have been completed in <br />accordance with the plans and <br />specifications; OR <br />b. The subdivider intends to <br />install such improvements in <br />the future and will enter into <br />an agreement guaranteeing <br />their installation <br />____ 4. One electronic copy and three <br />blueline or blackline prints of all: <br />a. Plans <br />b. Profiles <br />c. Cross sections <br />d. Specifications <br />____ 5. Title report showing the legal <br />owners at the time of filing the <br />map and issued within 6 months <br />____ 6. Deeds and easement <br />descriptions referenced in the <br />title report <br />____ 7. Guarantee of title <br />____ 8. Deeds for all adjoining property <br />____ 9. Copies of all maps referenced in <br />title report <br />____ 10. Written evidence of rights of <br />entry or permanent easements <br />across private property <br />____ 11. Improvement plans and <br />agreement <br />____ 12. Hydrology and hydraulic <br />calculations of all storm drains <br /> <br />7.A. - Page 50 of 121 <br />56