Laserfiche WebLink
I.B Is the project a “C.3 Regulated Project” per MRP Provision C.3.b? (Use table below to make determination.) <br />I.B.1 Enter the amount of Impervious surface Retained, Replaced or Created5 by the project (use DMA Table in Worksheet D): <br />Table I.B.1 Impervious6 and Pervious6 Surfaces (Match DMA Summary Table in Worksheet D, if applicable) <br />Pre-Project <br />I.B.1.a I.B.1.b I.B.1.c I.B.1.d I.B.1.e <br />Existing <br />(Pre-Project) <br />Impervious Surface <br />(sq.ft.) <br />Existing <br />Impervious <br />Surface to be <br />Retained5 (sq.ft.) <br />Existing <br />Impervious <br />Surface to be <br />Replaced5 (sq.ft.) <br />New Impervious <br />Surface to be <br />Created5 (sq.ft.) <br />Post-Project <br />Impervious <br />Surface (sq.ft.) <br />(=b+c+d) <br /> <br /> <br /> <br />I.B.1.f sq. ft. <br />Existing (Pre-Project) <br />Pervious Surface <br />(sq.ft.) <br />Post-project <br />Pervious Surface <br />(sq.ft.) <br />I.B.1.g <br /> <br /> I.B.1.h <br />Check One <br /> Yes No <br />I.B.2.a <br />I.B.2.b <br />I.B.2.c <br />I.B.2.d <br />I.B.2.e <br />I.B.2.f <br />I.B.2.g <br />I.B.2.h <br />I.B.2.i <br />I.B.2.j <br />Total Impervious Surface Replaced and Created: <br />(sum of totals for columns I.B.1.c and I.B.1.d): <br />Subtotal: <br />Impervious Surfaces (IS) <br />(e.g., sidewalks, driveways, parking areas, patios, roads, rooftops, <br />pools, pathways, etc.) <br />On-site area (within the parcel/private site boundaries) <br />Off-site area (e.g., frontage/other area in Public Right of Way) <br />Post-Project <br />Attach <br />WorksheetReview Steps <br />Pervious Pavement area on-site <br />Green Roof area on-site <br />Pervious Surfaces (PS) <br />(e.g., landscaping, pervious pavement, bioretention areas, parking <br />strips, street trees, etc. - both on-site and off-site) <br />Subtotal: <br />Total Project Area (should be equal to I.A.1) <br />Please review and attach additional worksheets as required below using the Total Impervious Surface (IS) Replaced or Created in <br />cell I.B.1.f from Table I.B.1 above and other factors: <br />All pervious off-site area (e.g., frontage/Public Right of Way)6 <br />Landscaping area on-site <br />I.B.2 <br />50% Rule Calculation <br />Is I.B.1.f greater than or equal to 5,000 sq.ft? (Or 10,000 sq.ft. for a Large Single-Family Home?) <br />If YES, project is a C.3 Regulated Project - complete Worksheet D. Then continue to I.B.2.f. <br />If NO, then skip to I.B.2.g. - or ask municipal staff for Small Project Checklist. <br />A <br />B, C <br />D <br />Does this project involve any earthwork and/or stockpiling of soil, aggregates etc? <br />If YES, then Check Yes, and Complete Worksheet A. <br />If NO, then Check No, and go to I.B.2.b <br />Is I.B.1.f greater than or equal to 2,500 sq.ft? <br />If YES, then the Project is subject to Provision C.3.i. - complete Worksheets B, C and go to I.B.2.c. <br />If NO, go to I.B.2.i - or ask municipal staff for Small Project Checklist. <br />Does the 50% rule apply to the project? Is I.B.1.h 50% or more? <br />If YES, site design, source control and treatment requirements apply to the entire on-site area. Continue to I.B.2.d <br />If NO, these requirements apply only to the impervious surface created and/or replaced. Continue to I.B.2.d <br />Is this project a Roadway Project and is I.B.1.f greater than or equal to 5,000 sq.ft? <br />If YES, project may be C.3 Regulated Project. See the Roadways Fact Sheet at: www.flowstobay.org/newdevelopment <br />If NO, go to I.B.2.e <br />_______________________________ <br />5 “Retained” means to leave existing impervious surfaces in place; “Replaced” means to install new impervious surface where existing impervious surface is removed anywhere on <br />the same site; and “Created” means the amount of new impervious surface being proposed which exceeds the total amount of existing impervious surface at the site. <br />6 Per the MRP, pavement that meets the following definition of pervious pavement is NOT an impervious surface. Pervious pavement is defined as pavement that stores and <br />infiltrates rainfall at a rate equal to immediately surrounding unpaved, landscaped areas, or that stores and infiltrates the rainfall runoff volume described in Provision C.3. Gravel <br />pavement is not pervious unless it is constructed using pervious pavement system designs or runoff flows to adjacent landscaping. Pervious off-site areas include landscaped <br />areas such as parking strips and street trees; off-site pervious pavement includes pervious concrete gutters and interlocking permeable concrete paver sidewalks, etc. 7/1/23 <br />Is I.B.1.f greater than or equal to 43,560 sq.ft, (i.e., one acre)? <br />If YES, project may be subject to Hydromodification Management requirements - complete Worksheet E then go to I.B.2.g. <br />If NO, then go to I.B.2.g. <br />Is I.A.4 greater than or equal to 43,560 sq.ft., (i.e., one acre)? <br />If YES, check box, obtain coverage under CA Construction General Permit & submit Notice of Intent to municipality- go to I.B.2.h. <br />If NO, then go to I.B.2.h. <br />For more information see: www.swrcb.ca.gov/water_issues/programs/stormwater/construction.shtml <br />Is this a Special Project or does it have the potential to be a Special Project? <br />If YES, complete Worksheet F - then continue to I.B.2.i. <br />If NO, go to I.B.2.i. <br />Is this project a High Priority Site? (Determined by the Municipality. High Priority Sites can include those located within 100 ft. of a <br />sensitive habitat, an Area of Special Biological Significance, a body of water, or on sites disturbing >=5,000 sq.ft. with slopes <br />>=15% (see I.A.5) [or per municipal criteria/map.] Subject to monthly inspections from Oct 1 to April 30.) <br />If YES, complete section G-2 on Worksheet G - then continue to I.B.2.j. and complete the Certification in Section I.A.6 <br />If NO, then go to I.B.2.j and complete the Certification in Section I.A.6 <br />For Municipal Staff Use Only: Are you using Alternative Certification for the project review? <br />If YES, then fill out section G-1 on Worksheet G. Fill out other sections of Worksheet G as appropriate. <br />See cell I.B.1.g above - Is the project installing 3,000 square feet or more of pervious pavement? <br />If YES, then fill out section G-3 on Worksheet G. Add to Municipal Inspection Lists (C.3 and C.3.h) <br />E <br />F <br />G <br />G <br />% <br />7.A. - Page 58 of 121 <br />64 <br />0 <br />0 <br />0 0 0 0 0 <br />0 <br />0 <br />NaN <br />0 <br />0 0