Laserfiche WebLink
ATTY/RESO.0080/PC RESO 590 VETERANS & 91 WINSLOW PROJECT – EXHIBIT A - COA <br />REV: 11-14-24 JB <br />Page 4 of 19 <br />space for bulky item collection such as mattresses, furniture, tires and white <br />goods. The Discards Collection Plan shall depict all such locations and confirm <br />compliance with this condition. <br /> c. Convenience and Accessibility: The recycling area shall be at least as accessible <br />and convenient for tenants and collection vehicles as the trash collection and <br />storage area. Separate, properly labeled (as per City standards) and dedicated <br />chutes must be provided for each and every collected stream of materials - not <br />just for trash (non-recyclable and non-compostable materials) if chutes are <br />planned. The trash and recycling room(s) or areas shall be located on an exterior <br />wall of the building (if indoors) with adequately-sized door or gate access to the <br />street through the wall so as to minimize distance for the collection vehicle <br />personnel and eliminate temporary outdoor storage of containers on collection <br />days. If the storage area is located outside, it must be easily accessible by the <br />collection vehicles. If the day-to-day-use trash and recycling area(s) cannot be <br />located adjacent to the street, service-day locations easily accessible by the <br />collection vehicle staff must be provided in an area on-site as per city standards in <br />enclosures completely screened and covered from off-site view by a solid fence or <br />masonry wall at least six feet high and in harmony with the architecture of the <br />building(s). <br /> d. Equipment/Storage: All trash enclosures shall be completely screened and <br />covered from off-site view by a solid fence or masonry wall at least six feet high <br />and in harmony with the architecture of the building(s). Alternatively, the trash <br />facilities may be placed within the building. Sewer drains, fire sprinklers, <br />enclosures, and roofing (if outdoors) shall be provided as per City standards. <br /> e. Implementation and Reporting: Applicant and its successors and assigns shall <br />implement the approved Discards Collection Plan and report its activities and <br />achievements to the Public Works Department annually as requested. <br /> <br />Final Map <br /> <br />20. Final Map - Obtain approval and record a Final Map prior to building permit issuance. All <br />final maps shall include the lot configuration and proposed easements and conform to <br />the Subdivision Map Act and Chapter 30 of the Municipal Code. As a part of the first Final <br />Map submittal to the City, the applicant shall submit utility clearance letter(s) or other <br />forms of explicit written approval from PG&E for the proposed vacation of the PG&E <br />easement(s). [SDR][ENGINEERING] <br /> <br />21. Agreements - Prior to Final Map approval, enter into the following agreements in a form <br />acceptable to the City Attorney and the Community Development Director: <br />[COA][ENGINEERING] <br />