Laserfiche WebLink
ATTY/RESO.0024/PC RESO 901 EL CAMINO <br />REV: 04-11-25 VR <br />Page 14 of 20 <br />habitat with the incorporation of mitigation measures which are included as project <br />conditions of approval. Replacement trees will be installed for the removal of the <br />existing 33 trees. The project includes 81 new trees including street trees, trees in <br />the plaza, and trees in the creek area. <br /> <br />4. The design of the subdivision or the type of improvements will not cause <br />serious public health problems. <br /> <br />As described in Section 4 and in the staff report, the Vesting Tentative Parel Map <br />is consistent with Redwood City’s General Plan, Downtown Precise Plan, <br />Municipal Code, Zoning Ordinance, and all applicable subdivision improvement <br />requirements and will not cause serious health problems. In addition, the <br />Consistency Checklist confirms that all environmental impacts of the Project will <br />be mitigated to the extent feasible <br /> <br />5. The design of the subdivision or the type of improvements will not conflict <br />with easements, required by the public at large, for access through or use of <br />property within the proposed subdivision, unless alternative easements will <br />be provided. <br /> <br />The proposed Vesting Tentative Parcel Map and associated improvements do not <br />conflict with essential public easements for access through, or use of, property <br />within the proposed Project site because the Project would include appropriate <br />new easements necessary for access and maintenance. Additionally, the Project <br />site does not have any public utilities or associated improvements that would be in <br />conflict with the proposed Project because it would provide all necessary public <br />services as required by approvals required for new construction. The Project is <br />requesting vacation of the existing California Street that runs through the project <br />site which is consistent with the DTPP New Streets and General Plan Circulation <br />Element because the Project is also creating a new extension of Franklin Street <br />which will restore the street grid. <br /> <br />6. The reasons submitted for the granting of any exceptions comply with the <br />requirements of Section 30.46. <br /> <br />Not applicable as no exceptions are requested. <br /> <br />Section 8.Downtown Planned Community Permit. The Planning Commission <br />makes the following findings based on facts and evidence in the Record about the <br />Downtown Planned Community Permit in conformance with the Downtown Precise Plan <br />Section 2.0.3.A.2.(b) and Article 47.4 of the Zoning Ordinance. <br /> <br />a. The application implements the adopted Precise Plan. <br /> <br />The proposed Downtown Planned Community Permit for a six-story mixed-use <br />office with R&D, Lab uses development with a Teen Center/Multi-Purpose