Laserfiche WebLink
ATTY/RESO.0024/PC RESO 901 EL CAMINO <br />REV: 04-11-25 VR <br />Page 23 of 27 <br />will also confirm substantial compliance with the approved plans during the scheduled final <br />inspection. [COA][PLANNING]: <br />Project Landscape Architect verifying substantial conformance with the approved <br />landscape plan, including species, size, quantity, and location of the approved trees, <br />shrubs, and groundcover. It shall also verify landscape lighting, fencing, irrigation, and <br />other details as applicable. <br />Project Architect verifying substantial conformance with the approved elevations, <br />colors, materials, exterior light fixtures, and architectural details. <br />112. Signs – Future signs require a separate sign permit and shall conform to the requirements <br />of the Downtown Precise Plan and Chapter 3 of the Municipal Code. [SDR][PLANNING] <br />Other Agency Permits <br />113. Caltrans - If a portion of the proposed work is within the State of California right-of-way <br />(Woodside Road, El Camino Real), the Applicant shall contact the California Department of <br />Transportation (Caltrans) at (510) 286-4417 to obtain all necessary Encroachment Permits. <br />[SDR][ENGINEERING] <br />114. Department of Fish and Wildlife, Army Corp of Engineers, Water Quality District – The <br />Applicant shall obtain all approval and necessary permits for any modifications to regulated <br />waters including but not limited to the proposed creek relocation prior to issuance of <br />grading or building permits. [COA] [ENGINEERING] <br />115. San Francisco Public Utility Commission (SFPUC) – The Applicant shall submit an <br />Underground Service Alert request to SFPUC prior to commencing construction. If the <br />proposed project involves digging or excavation around or near the SFPUC’s pipeline, <br />further review will be required. Prior to issuance of grading or building permits, please <br />submit verification to the Community Development Department that all SFPUC <br />requirements have been met. [COA] [PLANNING] <br />General Requirements <br />116. Modifications - Permit modifications that include changing the use, altering any structure, <br />or modifying improvements shall be reviewed by the final review authority of the originally <br />approved permit, unless the Community Development Director determines that the change <br />is minor, and requires approval by the Zoning Administrator. [COA][PLANNING] <br />117. Failure to Comply with Conditions of Approval. If the Applicant constructs buildings or <br />makes improvements in accordance with these approvals, but fails to comply with any of <br />the Conditions of Approval or limitations set forth in these Conditions of Approval and does <br />not cure any such failure within a reasonable time after notice from the City, then such <br />failure shall be cause for non-issuance of a certificate of occupancy, revocation or <br />modification of these approvals, or any other remedies available to the City. <br />[COA][PLANNING]