My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />11 Furnish Intercom Master Base Station for parking office, <br />per Specifications. <br />1 $4,500.00 $4,500.00 Intercoms can be <br />sent to a phone <br />number or cell <br />phone. This is the <br />price for a master <br />base station. <br />12 Furnish new Parking Payment information static signage <br />(quantity TBD), per Specification - include allowance for a <br />stated number of static signs as described in Specifications <br />and Drawings, coordinate content with City. <br />1 $3,000.00 $3,000.00 <br />13 Furnish new "STOP" pavement markings and static signs for <br />traffic control, per Drawings. <br />1 $7,500.00 $7,500.00 <br />14 Labor and Materials to mount, install, terminate, configure, <br />activate, and commission all above new equipment, <br />bollards, and static signage, per Specifications and <br />Drawings. To include labor and materials for all required <br />electrical and data communications wiring, conduit, <br />junction boxes, panel tie-ins, and any other required line <br />voltage and low-voltage infrastructure. Also to include <br />labor and materials for painting of STOP lane markings and <br />mounting of STOP signs. <br />1 $96,200.00 $96,200.00 <br />15 Labor and Materials to support Hardware Acceptance <br />Testing - FAT, LAT, ODT per Specifications. <br />1 $14,000.00 $14,000.00 LAT and ODT for <br />MSM <br />16 Instruction and Training for City personnel on Hardware 1 $2,000.00 $2,000.00 Includes training <br />for MSM <br />17 Freight Costs 1 $7,500.00 $7,500.00 <br />18 Sales Tax on Materials - calculate manually, as applicable, <br />and provide description of percent and total amount in <br />column D. <br />1 $29,625.18 $29,625.18 Sales Tax on <br />Parking <br />Hardware <br />at 9.88% <br />19 Hardware Warranty/Support, Years 1-2, including all labor, <br />materials, and spare parts required to provide on-site <br />service for complete system, with service levels as <br />described in Specification. <br />1 $22,400.00 $22,400.00 Hardware/support <br />warranty for <br />Devices for Year <br />1 and 2 <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 100 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.