Laserfiche WebLink
REV: 01-05-26 LR <br />D. At least 30 days prior to scheduled training sessions, deliver a Training Plan. <br />Include at a minimum, a description of all training courses including identification <br />of instructional outcome, duration of course, and type of presentations. <br />E. Testing Plan and Documentation: Provide a test plan for review and approval by <br />Owner or Owner’s authorized representative 30 days prior to start of first test. <br />Include demonstrations of compliance with specifications, contractual <br />compliance, disaster recovery testing and documentation, definitions of all test <br />objectives, participant responsibilities, documentation for tests, and procedures <br />for dealing with failures during test. <br />F. If the system requires a connection to the public internet via a fixed or cellular <br />connection, provide a cellular site survey of the subject parking facility areas <br />(including the interior of the garages) along with methodology for selection or <br />recommendation of carrier. Contractor is expected to do all required cellular <br />signal strength measurements and determine ideal modem and/or antenna <br />placement. Owner has no responsibility to ensure adequate cellular signal <br />strength. <br />G. Contractor is responsible for all permits and licenses and compliance with all <br />codes and regulations. <br />1.9 QUALITY ASSURANCE <br />A. All components and installation to comply with all laws, ordinances, codes, rules, <br />and regulations of public authorities having jurisdiction over this part of the work. <br />It is the responsibility of the Contractor to meet these and all other current <br />technical, performance, and safety standards that are applicable to all <br />components and to the entire system, even when not specifically referenced. <br />B. Open-architecture system where all interfaces (hardware and software) conform <br />to national and International Organization for Standardization (ISO) standards. <br />C. All materials and equipment listed, labeled, or certified by a nationally recognized <br />testing laboratory to meet Underwriters Laboratories, Inc. (UL) standards, where <br />test standards have been established. <br />1. Equipment and materials which are not covered by UL Standards may be <br />considered, provided equipment and material is listed, labeled, certified, or <br />otherwise determined to meet safety requirements of a nationally <br />recognized testing laboratory. <br />2. Equipment of a class for which no nationally recognized testing laboratory <br />accepts, certifies, lists, labels, or determines to be safe, will be considered <br />if inspected or tested in accordance with national industrial standards, such <br />as NEMA, or ANSI. Evidence of compliance includes certified test reports <br />and definitive product data. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 68 of 167)