My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />D. At least 30 days prior to scheduled training sessions, deliver a Training Plan. <br />Include at a minimum, a description of all training courses including identification <br />of instructional outcome, duration of course, and type of presentations. <br />E. Testing Plan and Documentation: Provide a test plan for review and approval by <br />Owner or Owner’s authorized representative 30 days prior to start of first test. <br />Include demonstrations of compliance with specifications, contractual <br />compliance, disaster recovery testing and documentation, definitions of all test <br />objectives, participant responsibilities, documentation for tests, and procedures <br />for dealing with failures during test. <br />F. If the system requires a connection to the public internet via a fixed or cellular <br />connection, provide a cellular site survey of the subject parking facility areas <br />(including the interior of the garages) along with methodology for selection or <br />recommendation of carrier. Contractor is expected to do all required cellular <br />signal strength measurements and determine ideal modem and/or antenna <br />placement. Owner has no responsibility to ensure adequate cellular signal <br />strength. <br />G. Contractor is responsible for all permits and licenses and compliance with all <br />codes and regulations. <br />1.9 QUALITY ASSURANCE <br />A. All components and installation to comply with all laws, ordinances, codes, rules, <br />and regulations of public authorities having jurisdiction over this part of the work. <br />It is the responsibility of the Contractor to meet these and all other current <br />technical, performance, and safety standards that are applicable to all <br />components and to the entire system, even when not specifically referenced. <br />B. Open-architecture system where all interfaces (hardware and software) conform <br />to national and International Organization for Standardization (ISO) standards. <br />C. All materials and equipment listed, labeled, or certified by a nationally recognized <br />testing laboratory to meet Underwriters Laboratories, Inc. (UL) standards, where <br />test standards have been established. <br />1. Equipment and materials which are not covered by UL Standards may be <br />considered, provided equipment and material is listed, labeled, certified, or <br />otherwise determined to meet safety requirements of a nationally <br />recognized testing laboratory. <br />2. Equipment of a class for which no nationally recognized testing laboratory <br />accepts, certifies, lists, labels, or determines to be safe, will be considered <br />if inspected or tested in accordance with national industrial standards, such <br />as NEMA, or ANSI. Evidence of compliance includes certified test reports <br />and definitive product data. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 68 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.