My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />8. Provide corrective patches and upgrades in the event security vulnerability <br />or system availability issues are discovered. <br />1.11 DELIVERY, STORAGE, AND HANDLING REQUIREMENTS <br />A. Contractor is responsible for insuring all shipped items. Any items damaged <br />during shipping will be replaced and shipped to the project site, by expedited <br />means if requested, at no additional cost to the Owner. <br />B. Owner will provide a designated storage/staging area for equipment that has not <br />been installed. Location to be determined after contract award. <br />C. It is the Contractor’s responsibility to protect the equipment from theft and <br />damage until Final Acceptance. Contractor will replace the equipment at no <br />additional cost to the Owner. <br />D. Deliver equipment to site in manufacturer’s original containers to prevent damage <br />and marked for easy identification. <br />PART 2 - PRODUCTS <br />2.1 LPR CENTRAL MANAGEMENT SYSTEM <br />A. Microprocessor controlled, in on-line, virtual real-time communication. In event of <br />failure during communication, an error-checking and recovery routine is <br />employed to prevent corruption of data. <br />B. Hosted system, capable of operating with proper user ID and password, to all <br />authorized users. <br />1. Provide continual software updates at no additional fees for the life of the <br />contract. <br />2. Maintain a secure connection while active, and automatically log-off after <br />programmable period of inactivity. <br />3. Remote access to LCMS over standard TCP/IP connection (may use web <br />browser-based applications). <br />4. Browser-based user-interface modules utilize client/server technology or <br />equivalent. The following general requirements apply to all components or <br />modules: <br />a. Windows-based graphical user interface. <br />b. Allow for both standard and custom report formats. <br />c. Adequate security to allow for different classifications of users. <br />5. System back-up in less than three hours. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 71 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.