Laserfiche WebLink
Exhibit "C" <br />Inspection & Maintenance Checklist <br />Infiltration Trench Maintenance Plan for <br />146 Roosevelt Ave <br />June 15t 2025 <br />An infiltration trench is a long, narrow, excavated <br />trench backfilled with a stone aggregate, and lined with <br />a filterfabric. Runoff is stored in the void space <br />between the stones and infiltrates through the bottom <br />and into the soil matrix. <br />Project Address and Cross Streets <br />146 Roosevelt Ave, Redwood City, CA 94061 <br />Assessor's Parcel No. 053.094.140 <br />Property Owner: Dancing Hu, Biru Zhou <br />Phone No.: (415)713-2259 <br />Designated Contact: Dancing Hu <br />Phone No.: (415)713-2259 <br />Mailing Address: 214 Campana Ave, Daly City, CA 94015 <br />The property contains 2 infiltration trench(es) and Pervious Pavers located as described below and as <br />shown in the attached site plan. <br />Infiltration Trench No.1 is located at the Western portion of the property site. <br />• Infiltration Trench No. 2 is located at the Eastern portion of the property site. <br />• Pervious pavers are located at the back of the property site. <br />I. Routine Maintenance Activities <br />The principal maintenance objective is to prevent sediment buildup and clogging, which reduces pollutant <br />removal efficiency and may lead to trench failure. Routine maintenance activities, and the frequency at which <br />they will be conducted, are shown in Table 1. <br />Table 1 <br />Routine Maintenance Activities for Infiltration Trenches <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Remove obstructions, debris and trash from infiltration trench <br />Monthly, or as needed after storm events <br />and dispose of properly. <br />2 <br />Inspect trench to ensure that it drains between storms, and <br />Monthly during wet season, or as needed after storm <br />within 5 days after rainfall. Check observation well 2-3 days <br />events <br />after storm to confirm drainage. <br />3 <br />Inspect filter fabric for sediment deposits by removing a small <br />Annually <br />section of the top layer. <br />4 <br />Monitor observation well to confirm that trench has drained <br />Annually, during dry season <br />during dry season. <br />5 <br />Mow and trim vegetation around the trench to maintain a neat <br />As needed <br />and orderly appearance. <br />6 <br />Remove anytrash, grass clippings and other debris along the <br />As needed <br />trench perimeter and dispose of properly. <br />7 <br />Check for erosion at inflow or overflow structures. <br />As needed <br />6 <br />Confirm that cap of observation well is sealed. <br />At every inspection <br />Page 1 <br />ATTYIAGR.2026.32610anquing Hu and Biru Zhou (146 Roosevelt Ave) (Page 13 of 16) <br />