Laserfiche WebLink
REV: 01-21-26 LR <br />• The 1200A MCC will house the meter and main sections, ATS, panelboard, transformer <br />and VFSDs. The MCC main will be kirk-keyed to the portable generator connection. <br />• A standalone control panel with CompactLogix PLC and Cradlepoint wireless <br />communication system. <br />• The SCADA strategy and programming report is not included. Process control descriptions <br />will be provided as a specification section. It shall include SCADA and programming <br />requirements. The specs are provided in lieu of the report and will present the same <br />information. <br />• Generator permitting is not included. Generator permitting is assumed to part of the <br />construction phase and will be part of the contractor’s scope. <br />• The existing 15kV overhead PG&E line is to be converted to underground and a new <br />transformer, per DTN’s previous coordination with AT&T prior to project being put on hold. <br />• The PG&E application will need to be restarted. <br />• The electrical building will be fully isolated from the wet well so there is no need for go/no- <br />go panels. <br />• No T24 calculations or forms will be required. <br />Task 16 – Additional CPT <br />Based on the preferred alternative concept, the bottom of the wet well is approximately within <br />liquefiable soils, and the sandy layer below is not expected to liquefy based on geotechnical <br />borings conducted. Based on preliminary analysis, tiedown piles are likely needed. For this task, <br />BAGG will refine the liquefaction analysis by performing up to three additional CPTs and updating <br />the geotechnical recommendations. <br />Amended Scope of Services <br />The amended contract scope of work is described in the following table which summarizes the <br />modified, added, and deleted tasks detailed in tables A, B, C, and D above. The amended contract <br />scope of work is described in the following table: <br />Task #Description Budget <br />1 Project Management and Meetings $108,402.00 <br />2 Site Surveys and Investigations $70,739.00 <br />3 Hydrologic and Hydraulic Analysis and Physical <br />Hydraulic Modeling <br />$109,695.00 <br />4 Alternatives Analysis and Basis of Design Report $57,444.00 <br />5 Environmental and Permitting $1,838.00 <br />6 60% Initial Design Submittal $297,969.00 <br />7 90% Semi-Final Design Submittal for Grant Review $201,313.00 <br />8 100% Final Design Submittal for Construction $96,070.00 <br />9 Price Avenue Storm Drain Upsizing $123,874.00 <br />10 Project Management and 42” Outfall CCTV $7,363.00 <br />11 Outfall Replacement $62,821.00 <br />12 Additional Boring $9,959.00 <br />13 Environmental Site Assessments – Phase I $12,483.00 <br />14 CEQA/NEPA & Permitting $182,197.00 <br />15 Project Startup $26,015.00 <br />16 Additional CPTs $14,022.00 <br />Authorized Tasks Subtotal $1,382,204.00 <br />Optional Tasks <br />OPT 1 Environmental Site Assessments – Phase II $23,556.00 <br />ATTY/AGR.2026/Amend. No.1/BKF Engineers (Amendment No. 1 to Agreement for Services) (Page 8 of 10)