My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2026-004968 Fourth Amendment to Development Agreement 1548 Maple, LLC
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Development Agreements
>
RecDoc2026-004968 Fourth Amendment to Development Agreement 1548 Maple, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 4:40:27 PM
Creation date
2/20/2026 4:37:58 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2026-004968
Rec Date
1/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gated, <br />pr-:ep to the County Segment Outside Date, te pr-eduee eenstruetieli fled engineering <br />of Blerniquist DevelepeF Segment and Bloniquist County Segment at a Wer- date. if' <br />City is able to obtahi the Ceunty Aotherizfitk)n aiid eamplete the Abatement Work by th <br />Geanty Segment Outside Date then, 10 ensure that the construction of the Blomquist — <br />Developer Segment and Blomquist - County Segment is coordinated and appropriately <br />phased with the Project, Developer shall eemmenee construction of the <br />Blomquist — Developer Segment and Blomquist - County Segment on or before the late <br />af(i) ninety(90) days fellowing the date Gky notifies Developertha4 City has obtained the <br />County and d . pleted t�,e � i,,t�.._., .. ■a eplE,or- r.:• issuance of the certificate <br />of occupancy for the first residential unit (other than temnorary certificates of Occuaancv <br />for w building containing model residential unit_), or such later date as <br />mutually agreed to by the Parties in writing. Developer shall substantially complete the <br />Blomquist - Developer Segment and Blomquist — County Segment within eighteen (18) <br />months after commencement of construction. Notwithstanding anything to the contrary in <br />this Section 3.3.D, in no event shall Developer be required to commence construction of <br />the Blomquist — Developer Segment and Blomquist - County Segment if Developer, after <br />best efforts, is unable to obtain armaintain all required permits and authorizations for such <br />work from regulatory agencies including the U.S. Army Corps of Engineers (the "Non - <br />County Authorizations"). <br />ATTY/AGR/2025/AMEND.N0.4 - 1548 MAPLE DA <br />REV: 01-22-26 VR <br />Page 5 of 12 <br />i ■ <br />Mumit P-41 <br />-r- <br />JPTFI <br />Oil <br />1111HOM". <br />.4 WOM <br />1110411,01 <br />I OVA, <br />ON <br />ATTY/AGR/2025/AMEND.N0.4 - 1548 MAPLE DA <br />REV: 01-22-26 VR <br />Page 5 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.