My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2026-004839 STMMA 146 Roosevelt Ave.
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
2026
>
RecDoc2026-004839 STMMA 146 Roosevelt Ave.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 12:47:25 PM
Creation date
2/25/2026 12:46:54 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2026-004839
Rec Date
1/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "C" <br />Inspection & Maintenance Checklist <br />Infiltration Trench Maintenance Plan for <br />146 Roosevelt Ave <br />June 15t 2025 <br />An Infiltration trench is a long, narrow, excavated <br />trench backfilled with a stone aggregate, and lined with <br />a fifterfabric. Runoff rs stored in the void space <br />between the stones and inf<itrates through the bottom <br />and into the soil matrix. <br />Project Address and Cross Streets <br />146 Roosevelt Ave Redwood City,CA 94051 <br />Assessor's Parcel No. 053.094.140 <br />Property Owner: Dan i )g Hu Biru Zhou <br />Phone No.: (415)713-2259 <br />Designated Contact: Dancing Hu <br />Phone No.: 415 713-2259 <br />Mailing Address: 214 Cam ana Ave Dalv ritv CA 94015 <br />The property contains 2 infiltration trench(es) and Pervious Pavers located as described below and as <br />shown in the attached site plan. <br />■ infiltration Trench No.1 is located at the Western portion of the property site. <br />■ Infiltration Trench No. 2 is located at the Eastern portion of the property site. <br />■ Pervious pavers are located at the back of the property site. <br />I. Routine Maintenance Activities <br />The principal maintenance objective is to prevent sediment buildup and clogging, which reduces pollutant <br />removal efficiency and may lead to trench failure. Routine maintenance activities, and the frequency at which <br />they will be conducted, are shown in Table 1. <br />Page 1 <br />ATTY/AGR.2025.326/Danquing Hu and Biru Zhou (146 Roosevelt Ave) (Page 13 of 16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.