Laserfiche WebLink
ACtEit:ildUt-T.7 2 i <br />SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. <br />Bid items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless <br />words are specifically requested. <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />No. <br />Mobilization, Notification, <br />Construction Layout, Job Site <br />Management, Demobilization <br />1 <br />LS <br />$1,$a9'. 16 <br />g1,ecIJ3. "ts <br />And Other Incidentals (6% of <br />1 <br />the total base bid) --— <br />1 <br />LS <br />Traffic Control (5% of the total <br />2 <br />base <br />1 <br />LS <br />1,U00,06 <br />1,1000, 06 <br />3 <br />Install Project Information Signs <br />Construction Survey and <br />_ <br />1 <br />LS <br />Staking (2.5% of total base <br />90,°I�Iq .�`+, <br />9.mi'tel , 2-$r <br />4 <br />bid <br />Water Pollution Control Plan <br />24115(&q.51} <br />' <br />24,seq .54 <br />5 <br />1.5% of total base bid <br />1 <br />LS <br />6 <br />Demolition of Curb & Gutter <br />960 <br />LF <br />15-00 <br />14t , �} 0 0. 0 0 <br />7 <br />Demolition of Concrete <br />Sidewalks <br />6500 <br />SF <br />I Z • 0 ° <br />i $, OOo . OD <br />Demolition of Striping and <br />�1,BSS,�q <br />21,$55 q <br />8 <br />Pavement Markings <br />1 <br />LS <br />,� <br />9 <br />Adjust Facility to Grade <br />36 <br />EA <br />500.00 <br />%0,000,00 <br />10 <br />Modify Inlet (Reconstruct To <br />1 <br />EA <br />3,000.00 <br />3,oa0 , 00 <br />11 <br />Remove Storm Drain Inlet <br />Remove Storm Drain Line <br />4 <br />EA <br />x,15 4 . to el <br />q ,10 I J j .-7 la <br />11,250.06 <br />-16,006, 0 0 <br />150 00 0. Om <br />12 <br />45 <br />780 <br />1 <br />LF <br />-2-,0, 00 <br />100.00 <br />13 <br />Roadway Excavation <br />CY <br />14 <br />Remove Quick Build Materials <br />LS <br />LS <br />I S, 000 , 0 <br />15 <br />Clear and Grubbing <br />1 <br />2, 500.17t1 <br />2,Sot7 , 00 <br />_ <br />1100 <br />TONS <br />2 50 . bb <br />2'7 S, o00 . 00 <br />_ <br />16 <br />HMA Asphalt Concrete - Type A <br />(7.5" Pavement Section) <br />17 <br />Microsurfacing <br />19900 <br />SQYD <br />S. 613 <br />1 1 S, 00-7 , 00 <br />18 <br />f <br />Minor Concrete - Sidewalk <br />Reinforced Concrete - Traffic <br />5800 <br />SF <br />1 a . Ob <br />1041400-00 <br />41, 32S. 0 0 <br />3 3.0 (v <br />19 <br />Circle <br />1250 <br />SF <br />VERA AVENUE BIKE BOULEVARD PROJECT 004113-2 <br />