My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2026-002924 Development Agreement 901 El Camino Real
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Development Agreements
>
RecDoc 2026-002924 Development Agreement 901 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 4:33:37 PM
Creation date
3/17/2026 4:29:08 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Development Agreement - El Camino Real Holdings JV
Doc Num
2026-002924
Rec Date
1/20/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by parcel map the exchange of its fee interest in the City Parcel to the Developer by quitclaim <br />deed, in a form substantially similar to the form attached as Exhibit B-2. The City shall execute <br />and deliver the quitclaim deed for the City Parcel promptly prior to the recordation of the parcel <br />map consistent with the V"CPM, which will have required the City's approval of the required <br />Subdivision Improvement Agreement (defined below) for the Franklin Street Segment, including <br />all required improvement plans, permits and financial security. <br />B. Upgraded SamTrans Bus Stop. As indicated in the Project Approvals, <br />Developer shall design, construct, and relocate a new SamTrans bus stop at a new location to the <br />south of the existing location on EI Camino Real, which includes an upgraded bus shelter design <br />approved by SamTrans. <br />C. Subdivision Improvement Agreement. Developer's obligation to construct <br />or cause the construction of, post improvement security, and provide warranties for the various on- <br />site and off-site public improvements required by the Project Approvals and this Agreement shall <br />be set forth in a subdivision improvements agreement ("Subdivision Improvement Agreement"), <br />the form of which shall be reasonably acceptable to the City Attorney. The Subdivision <br />Improvement Agreement shall be entered into by the Parties on or before approval of the parcel <br />map for the Project pursuant to the VTPM. <br />Section 2.5 Sales Tax Point of Sale Designation. Developer shall use good faith efforts <br />to the extent allowed by law to require all persons and entities providing bulk lumber, concrete, <br />structural steel and pre -fabricated building components, such as roof trusses, used in connection <br />with the construction and development of, or incorporated into, the Project, to: (A) obtain a use <br />tax direct payment permit; (B) elect to obtain a subcontractor_ permit for the job site of a contract <br />valued at Five Million Dollars ($5,000,000) or more; or (C) otherwise designate the Property as <br />the place of use of material used in the construction of the Project in order to have the local portion <br />of the sales and use tax distributed directly to the City instead of through the County -wide pool. <br />Developer shall instruct each of its general or subcontractors to cooperate with the City to ensure <br />the full local sales/Erse tax is allocated to City. To assist City in its efforts to ensure that the full <br />amount of such local sales/use tax is allocated to the City of Redwood City, Developer shall <br />provide City with an annual spreadsheet, or shall instruct their general or subcontractors to <br />cooperate with the City in providing an annual spreadsheet, which shall include a list of all <br />subcontractors with contracts in excess of the amount set forth above, a description of all applicable <br />work, and the dollar value of such subcontracts. City may use said spreadsheet sheet to contact <br />each subcontractor who may qualify for local allocation of use taxes to the City. Notwithstanding <br />the foregoing, nothing in this Section 2.5 shall apply to tenants who perform their own tenant <br />improvement work. In the event that City determines, after following the procedures in Article I 1 <br />[Defaults; Remedies; Termination] of this Agreement, that the City has received less than the <br />amount of sales/use taxes as required by this Section 2.5, Developer shall pay the amount of the <br />delta within forty-five (45) days of receiving written notice from the City of the delta amount. This <br />obligation shall terminate upon the completion of construction (as evidenced by the City's final <br />inspection). The City shall provide any such written notice of the delta amount to the Developer <br />within one (1) year of such completion of construction. If the City determines that the Developer <br />owes the City any delta under this Section 2.5, Developer agrees to pay interest at the rate of six <br />percent (6%) per annum of the payment due beyond the forty --five (45) day due date. The obligation <br />ATTY/AGR/2025.085 —901 EL CAMINO REAL DA <br />REV: 08-01-25 VR <br />Page 15 of 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.