Laserfiche WebLink
adopted after the Effective Date and which conform to the terms of this Agreement, including this <br />Section 5.2. As of the Agreement Date, City is unaware of any pending efforts to initiate or <br />consider applications for new or increased special taxes or assessments covering the Property, or <br />any portion thereof. City shall retain the ability to initiate or process applications for the formation <br />of new assessment districts or imposition of new taxes covering all or any portion of the Property <br />in accordance with the Applicable City Regulations, but only if such taxes or assessments are <br />adopted by or after citywide voter approval, or approval by landowners subject to such taxes or <br />assessments, and are imposed on other land and projects of the same category within the <br />jurisdiction of City in a reasonably proportional manner as determined by City, and, as to <br />assessments, only if the impact thereof does not fall disproportionately on the Property as <br />compared to the benefits accruing to the Property as indicated in the engineers report for such <br />assessment district. Nothing herein shall be construed so as to limit Developer from exercising <br />whatever rights it may otherwise have in connection with protesting or otherwise objecting to the <br />imposition of taxes or assessments on the Property. <br />Section 5.3 MMRP Fair Share Contributions. As set forth in Section 8.8 below, <br />Developer is required and agrees to comply with all CEQA mitigation measures adopted as part <br />of the Project Approvals, including but not limited to designing and installing, to the extent <br />applicable, upgrades to the water system, sanitary sewer system, stormwater system, and installing <br />an extension to the City's recycled water infrastructure. Specifically, as provided by the DTPP <br />Plan -Wide Amendments MMRP adopted by the City Council in connection with the DTPP SEIR, <br />and to the extent applicable, the Developer shall be required to bear the cost of the design, <br />constructing or installing these upgrades and improvements, including but not limited to the <br />installation of an up to 16 -inch outside diameter recycled water supply pipeline to serve the Project <br />from the nearest point of connection to the intersection of Jefferson Avenue and Marshall Street, <br />along Marshall Street, Broadway, California Street, and through the entire project site frontage to <br />the intersection of new Franklin Street and James Avenue, as more particularly described in the <br />Project Approvals, with sufficient recycled water capacity to provide for all of the Project's <br />recycled water demands pursuant to City standards ("Project Recycled Water Pipeline"). When <br />the Developer intends to prepare the scope of work for the preparation of the improvement plans <br />for the Project Recycled Water Pipeline, the Developer shall provide written notice to the City <br />with clear reference to this Section and the City shall have ninety (90) days to notify the Developer <br />in writing of its intent to require the Developer instead design an up to 30 -inch forjust the segment <br />along Marshall Street through new Franklin Street and James Street intersection ("City Upsized <br />Recycled Water Line") and subject to a confirmation of the City's binding commitment to fund <br />(from any appropriate source at the City's discretion, other than the Developer) the difference <br />between the estimated cost of the Project Recycled Water Pipeline and the City Upsized Recycled <br />Water Line. The terms of the City's reimbursement will be outlined in the improvement agreement. <br />Developer may also be reimbursed by subsequent development projects within the DTPP area to <br />pay the fair -share contribution for any costs of constructing or installing the required <br />improvements that benefit the subsequent projects. If the City or other developer has been <br />approved for construction of all or any portion of the City Upsized Recycled Water Line, such that <br />the Developer is not required to design or construct all or a portion of the recycled water line, or <br />any other required improvements, the Developer agrees to pay the Project's fair share for the <br />portion of recycled water main approved for construction by City or other developer. Without <br />limiting Developer's obligation to pay all required contributions, Developer agrees to pay the <br />Project's fair share contributions required to mitigate impacts pursuant to the DTPP SUR for any <br />ATTY/AGR/2025.085 —901 EL CAMINO REAL DA <br />REV: 08-01-25 VR <br />Page 27 of 48 <br />