My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Concourse Tech, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Under $110K
>
Agmt26 Concourse Tech, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 11:47:37 AM
Creation date
4/13/2026 11:47:27 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
SaaS Agreement with City of Redwood City
RMP File Number
304.5
Date
4/9/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-07-24 LF <br />EXHIBIT C <br />CLOUD SERVICES SLA <br />1. Service Availability <br />Provider commits to a minimum uptime of 99.9% measured on a monthly basis, excluding <br />scheduled maintenance windows. Uptime is defined as the period during which the SaaS Solution <br />is accessible and functional for authorized users. <br />METRIC COMMITMENT <br />Monthly Uptime 99.9% <br />Maximum Unscheduled Downtime per Month 43 minutes <br />Measurement Period Calendar month <br />2.Scheduled Maintenance <br />Maintenance Window: Sundays, 12:00 AM – 6:00 AM Pacific Time <br />Advance Notice: Provider will provide at least 72 hours' written notice for scheduled maintenance <br />that may impact availability <br />Emergency Maintenance: Provider will notify the City as soon as practicable in the event <br />emergency maintenance is required outside the standard window <br />Scheduled maintenance windows are excluded from uptime calculations <br />3.Performance Standards <br />TRANSACTION TYPE MAXIMUM RESPONSE <br />TIME <br />Query lookups and common inquiries (search, displaying results, <br />reports) <br />3 seconds (average) <br />Field-to-field prompting within a single screen 1 second <br />Page/screen navigation 3 seconds (average) <br />Document upload (per file, up to 25MB)10 seconds <br />4.Data Backup & Recovery <br />Backup Frequency: Automated daily backups Retention Period: 90 days <br />Recovery Capability: Point-in-time recovery within the retention period <br />Recovery Time Objective (RTO): 4 hours from determination of need for restoration <br />Recovery Point Objective (RPO): Maximum 12 hours of data loss (last daily backup) <br />Backup Testing: Provider will test backup restoration procedures quarterly <br />5. Network & Infrastructure <br />Hosting Location: US-based data centers only <br />Bandwidth: Provider will maintain sufficient network bandwidth between its servers and the <br />Internet to allow the platform to operate as intended <br />Redundancy: Platform hosted on infrastructure with redundant power, network, and storage <br />Data Encryption: AES-256 encryption at rest; TLS 1.3 encryption in transit <br />ATTY/AGR.2026.096/TBD (Relocation Assistance Software) (Page 21 of 33)
The URL can be used to link to this page
Your browser does not support the video tag.