My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Water Supply Agrement Amended and Restated
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Water Supply Agrement Amended and Restated
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2026 11:56:04 AM
Creation date
6/26/2026 11:53:40 AM
Metadata
Fields
Template:
Agreement
Date
2/19/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
capable of measuring actual flows with an error of less than +/- 2%. If a particular calibration <br />instrument is not rated for accuracy by the A WWA, its accuracy wil be determined by reference <br />to its manufacturer's representations as to accuracy. <br />6. Calibration Reports <br />Within foureen (14) working days after the beginning of each quarter, the metering <br />consultant shall submit a written progress report of the work performed during the previous <br />quarter. Each quarterly report wil describe the results of the meter calibrations and any other <br />tasks performed. The report wil also include comments regarding any observations of abnormal <br />conditions and any recommendations regarding these meters and their related equipment. <br />The reports must include complete descriptions and status of meters and related <br />equipment, dates and times of service, all calibration specifics, pipeline dimensions, range of <br />flow rates and totalized volumes, before and after error analysis and accuracy levels achieved, <br />testing equipmentused, and the name(s) of the person(s) that performed the work. <br />When appropriate and necessary, the metering consultant shall provide recommendations <br />for improving the accuracy and reliability of the equipment and/or the methods of data <br />collection. If, in the opinion of the metering consultant, the condition of a meter or its associated <br />metering equipment is found to be defective, damaged, or otherwise in need of immediate repair <br />or replacement, the metering consultant shall: 1) promptly notify the appropriate SFPUC <br />personnel of the problem and recommend a solution to the problem so that the SFPUC can <br />determine how to address it and, 2) include the problem description in its quarterly report. <br />- <br />21 <br />March 11,2009
The URL can be used to link to this page
Your browser does not support the video tag.