My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Water Supply Agrement Amended and Restated
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Water Supply Agrement Amended and Restated
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2026 11:56:04 AM
Creation date
6/26/2026 11:53:40 AM
Metadata
Fields
Template:
Agreement
Date
2/19/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />1 <br /> <br />15048734.1 <br />ATTACHMENT R-2 <br /> <br />SPECIAL CLASSIFICATION OF DISCRETE PROJECTS FOR <br />2018 WSA AMENDMENT PURPOSES <br /> <br /> <br />Asset Asset <br />Classification <br />Project Project <br />Classification 1 <br />Lower Cherry <br />Aqueduct <br />Joint Lower Cherry Aqueduct Project Water 2 <br />Mountain Tunnel Joint Mountain Tunnel Interim Work Water 3 <br />Mountain Tunnel Joint Mountain Tunnel Long Term <br />Repairs <br />Water3 <br />Mountain Tunnel Joint Mountain Tunnel Flow Control <br />Facility (FCF) Project <br />Joint5 <br />Kirkwood Penstock Power Kirkwood Penstock Project Joint 4 <br />Moccasin Powerhouse <br />Penstock <br />Power Moccasin Penstock Project Joint4 <br />Moccasin Lower Dam Water Moccasin Dam Interim Repairs Joint 5 <br />Moccasin Lower Dam Water Moccasin Dam Long-Term <br />Improvements <br />Joint5 <br /> <br /> <br />These Project Classifications are Exceptions to the Fixed Asset Classifications in <br />Attachment R-3 <br />Attachment R-3 lists major Hetch Hetchy Enterprise Existing System Assets and their agreed- <br />upon classifications (Power, Joint or W ater). The classification for all Existing System Assets is <br />fixed and applies to all related expenditures, including capital, regulatory, operating and <br />maintenance expenses, and whether the expenditure alters, rebuilds or replaces the asset, and <br />any appurtenances. <br /> <br />1 Expires June 30, 2034 <br />2 Project capital costs may include costs incurred in FY 2013-14 and subsequent Fiscal Years <br />until project is complete <br />3 Project capital costs may include costs incurred in FY 2011-12 and subsequent Fiscal Years <br />until project is complete <br />4 Project capital costs may include costs incurred in FY 2009-10 and subsequent Fiscal Years <br />until project is complete <br />5 Project capital costs may include costs incurred in FY 2017-18 and subsequent Fiscal Years <br />until project is complete
The URL can be used to link to this page
Your browser does not support the video tag.