My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 7 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />The recycled water main extension is partially within Caltrain right-of-way, owned and <br />operated by the Peninsula Corridor Joint Powers Board (JPB). An executed license agreement <br />between the Developer and JPB was required to construct this facility. <br />Upsize of a sanitary sewer main in Bradford Street between Main and Walnut Streets and in Walnut <br />Street from Bradford Street to approximately 100 feet north of Veterans Boulevard. <br />Installation of traffic calming improvements, identified and required as community benefits, on <br />Redwood Avenue between Hudson Avenue and El Camino Real. <br />Installation of intersection improvements at the Main Street/Chestnut Street and Main Street/Pine <br />Street intersection, including a new signal at the Main Street/Pine Street intersection. <br />Installation of improvements along El Camino Real, including a signalized pedestrian crossing and <br />protected bike lanes. <br />Improvement and expansion of the Main Street Dog Agility Park. <br />Contribution of $750,000 toward improvements to the parcel located at the southwest corner of <br />Lathrop Street/Maple Street. <br />The SIA required the developer to post Performance and Labor and Security Bonds, each in the amount <br />of $37,176,856, which represents the value of the required improvements. <br />ANALYSIS <br />The developer completed construction of the project’s three commercial parcels (Parcels B, C, and E). To <br />support these parcels, the developer also completed many of the required infrastructure improvements. <br />The remaining two parcels, Parcels A and D, are proposed residential parcels and have not yet pulled <br />permits or started construction. Tables 2 and 3 list the required improvements and identify which <br />improvements have been completed to date.. <br />Table 2: Main Project Area Infrastructure Improvements <br />Infrastructure Improvements Completed To Be <br />Completed <br />Underground utility backbone infrastructure (domestic water mains, sewer <br />main, recycled water main, storm drain main)X <br />Underground utility services (water, sewer, storm, dry utilities)X <br />Streets (Pavement, Curb & Gutter, Signing & Striping)X <br />Commercial Parcel Frontage (Sidewalks, Streetlights, Street Trees, <br />Stormwater Treatment)X <br />Residential Parcel Frontage (Sidewalks, Streetlights, Street Trees, <br />Stormwater Treatment) X <br />Creek Pathway X <br />7.G. - Page 4 of 104 <br />102
The URL can be used to link to this page
Your browser does not support the video tag.