My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Standard OSI Rev 12/2013 <br /> <br />4. Special Event Service <br />• 3 to 4 trains each direction on days of San Francisco Giants Baseball home games <br />• 3 to 4 trains each direction on days of Stanford Football home games <br />• 3 to 4 trains each direction for other special events. <br /> <br />5. Other passenger rail carriers in accordance with their published timetables, including <br />but not limited to Amtrak Intercity, Altamont Commuter Express (ACE), and Capital <br />Corridor all of which operates in Santa Clara County segment. <br /> <br />B. Mainline - Future Owner Commuter Operations and UPRR freight traffic <br /> <br />1. Owner’s and other operator’s commuter train traffic may vary in time and frequency <br />over the course of the contract per published revisions to timetables. <br /> <br />2. UPRR freight traffic is subject to change without notice at the discretion of UPRR. <br /> <br /> <br />1.07 SAFETY <br /> <br />A. Employees of the Contractor scheduled or expected to perform work within Caltrain <br />Property are required to have successfully completed, within the last twelve (12) <br />months, Caltrain’s Roadway Worker Protection training program. The Contractor shall <br />forward to Caltrain records of those successfully completing the course. <br />B. Roadway Worker Protection Act: Contractor shall at all times comply with provisions of <br />the Federal Rail Administration Regulation 49CFR214 (Roadway Worker Protection) as <br />well as to the Permittor (Licensor) On-Track Safety Program. <br />C. Zero Tolerance: The Caltrain Zero Tolerance Policy is attached and made a part hereof. <br /> <br />ATTY/AGR.2026.195/JPB License - Recycled Water at Beech (REV: 07-09-26 VR) (Page 27 of 29) <br />7.G. - Page 43 of 104 <br />141
The URL can be used to link to this page
Your browser does not support the video tag.