My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />923792.1 <br />work on the Property. Although Railroad will reasonably cooperate with Permittee so that the <br />Work may be handled in an efficient manner, Permittee hereby waives and releases Railroad <br />from any claim for damages against Railroad in the event the Work is delayed for any reason <br />whatsoever. <br />(d) No Interference With Railroad Operations. Permittee shall perform its work <br />in such manner and at such times as shall not endanger or interfere with the safe operation of <br />the tracks and property of Railroad and traffic moving on such tracks, as well as wires, signals, <br />pipelines, utilities and other property of Railroad, its tenants or licensees, at or in the vicinity of <br />the work. All work contemplated in this Agreement shall be performed in a good and worker- <br />like manner to the satisfaction of the parties, and each portion shall be promptly commenced by <br />the party obligated to do the same and thereafter diligently prosecuted to completion in its <br />logical order and sequence. <br />(e) Repair of Damage. Permittee shall take protective measures necessary to <br />keep Railroad’s facilities, including track ballast, free of sand or debris resulting from its <br />operations. Any damage to Railroad’s facilities resulting from Permittee’s operations will be <br />repaired or replaced by Railroad at Permittee’s sole cost and expense, which Permittee shall pay <br />to Railroad promptly upon demand therefor. <br />(f) Underground Facilities. Permittee shall be solely responsible at its own cost <br />for identifying the location of all pipelines (including, but not limited to, high pressure <br />petroleum, gas and water pipelines), fiber optic lines and all other utilities of whatever nature <br />on the Property, and for relocating all said pipelines and utilities which would interfere with <br />Permittee’s Work. Permittee shall relocate, or arrange for the relocation by a third-party <br />contractor approved by Railroad, any and all Railroad signal lines and Railroad communication <br />facilities, the existing location of which would interfere with the Work, at Permittee’s sole cost <br />and expense, unless other arrangements are made by separate agreement. Absence of markers <br />does not constitute a warranty by Railroad of the absence of subsurface installations. It shall be <br />Permittee’s responsibility to determine the existence of any underground facilities and <br />Permittee shall call Underground Service Alert at 1-800-642-2444 prior to beginning any work on <br />the Property. Since there is the possibility of the existence of pipelines or other structures <br />beneath the Property, if Permittee should excavate or drill, then Permittee’s forces shall explore <br />such structures with hand tools to a depth of at least eight feet (8’) below the surface of the <br />ground or, at Permittee’s option, use suitable detection equipment, prior to drilling or <br />excavating with mechanized equipment. <br />(g) Storage. Permittee shall not pile or store any tools or other materials or <br />park any equipment, when not in use, closer to the center of nearest railroad track then <br />permitted by the following permanent clearances: <br />(i) 25’-0” horizontally from center line of track; and <br />(ii) 22’-6” vertically above top of rail. <br />The placement of piles, forms, braces, shoring, false work, or other construction <br />supports shall be in accordance with Appendix H of the most current Caltrans Trenching and <br />Shoring manual. <br />ATTY/AGR.2026.194/JPB License - Domestic Water in Pennsylvania (REV: 07-09-26 VR) (Page 16 of 29) <br />7.G. - Page 61 of 104 <br />159
The URL can be used to link to this page
Your browser does not support the video tag.