My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />4/8/26 9 <br />Table 2. Additional SDBL Concessions Available to SB 79 Projects <br />Tier and Distance from TOD Stop Minimum Density to <br />Qualify for Additional <br />Concessions <br />Additional Concessions Available <br />Tier 1 and within ¼ mile of stop. 90 du/ac • Three additional concessions for <br />projects providing housing for <br />extremely low income households. <br />• Two for projects providing housing <br />for very low income households. <br />• One for projects providing housing <br />for low-income households. <br />Tier 1 and between ¼ and ½ mile <br />of stop in a city with at least <br />35,000 residents. <br />75 du/ac Same as above. <br />Tier 2 and within ¼ mile of stop. 75 du/ac Same as above. <br />Tier 2 and between ¼ and ½ mile <br />of stop in a city with at least <br />35,000 residents. <br />60 du/ac Same as above. <br />Local Government Options to Modify <br />SB 79 gives jurisdictions three main ways to adjust implementation of SB 79. For any of these options, HCD <br />review is required per Section 65912.160, as discussed in the Review and Enforcement section below. <br />Action Item: Jurisdictions pursuing any of these options should coordinate early with HCD on timing, data, and <br />documentation requirements. Given HCD’s permitted review times, if jurisdictions intend to adopt a plan or <br />ordinances that will be in effect when SB 79 becomes effective on July 1, 2026, they should aim to submit <br />adopted ordinances to HCD by March 2026. <br />Exempting Certain Areas <br />A jurisdiction may adopt an ordinance, subject to HCD review under Section 65912.160 (as discussed in the <br />Review and Enforcement section below), to exempt limited areas within one-half mile of a TOD stop from SB <br />79 eligibility. These exemptions are limited to (1) sites that lack a pedestrian access path of less than one mile <br />to the TOD stop, or (2) in jurisdictions with at least 15 TOD stops, areas that are designated in the <br />8.A. - Page 27 of 97 <br />245
The URL can be used to link to this page
Your browser does not support the video tag.