My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 17 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />addition, State law now requires that housing projects be evaluated by jurisdictions utilizing only <br />objective design standards that are measurable and non-discretionary; the rationale for holding a <br />public hearing—to provide subjective, discretionary feedback—is greatly diminished, even if such <br />feedback would enhance the housing project. <br />The proposed amendments would establish Article 41.15 of the Zoning Code to create a local <br />ministerial (i.e., by-right) approval process for 100% affordable housing projects to facilitate and <br />accelerate housing production. <br />The proposed amendments would further implement Programs H4-6 and H4-9 of the City’s Housing <br />Element, which obligate the City to streamline review and processing of all residential development, <br />including affordable housing and to reduce the number of projects requiring Planning Commission <br />review. Staff anticipate that these amendments could save affordable housing applicants several <br />months' time in their entitlement process. <br />2.Increase Minimum Height Threshold for Review by AAC and Planning Commission – Currently, <br />construction of a new building or an addition that exceeds 3 stories or 35 feet in height requires review <br />by the AAC and approval of the Planning Commission. The proposed amendments to Article 41.4 of <br />the Zoning Ordinance and Chapter 2.110 of the Municipal Code would increase the minimum building <br />height threshold for review by the AAC and Planning Commission from 35 feet to 45 feet in height <br />(but retain the 3-story threshold). The intent behind this update is twofold. First, it would streamline <br />review and approval of smaller multifamily housing projects that utilize common typologies such as <br />the 3-story townhome, which often exceed 35 feet in height due to factors such as lot slope, <br />foundation design, garage design, floor heights, and roof form. An increase in the minimum building <br />height threshold would allow for greater design flexibility for residential development without <br />requiring multiple public hearings. Secondly, as noted above in the discussion on ministerial review of <br />100% affordable housing projects, reducing the number of public hearings can have a meaningful <br />impact on the cost and feasibility of housing production and discretionary feedback is limited by State <br />law requirements to evaluate housing projects utilizing only objective design standards. New buildings <br />and additions exceeding three stories would still require review by the AAC and Planning Commission. <br />3.Increase Length of Entitlement Period from 3 years to 5 years – Currently planning entitlements, or <br />planning permits, are active for 2 years and may, upon written request, be extended by the Zoning <br />Administrator up to one 1 year, for a total of 3 years. Within the three-year entitlement period, an <br />applicant must obtain financing, have construction plans drawn up for City review, and secure building <br />permits. Larger projects require more complex construction plans with extensive lead times for <br />drawings and permit review. In addition, affordable housing projects often need to secure various <br />financing sources over multiple funding cycles, which may only occur once a year. Review of an <br />expired entitlement can be extensive and costly for the applicant, particularly if local or state codes <br />have been updated since the original entitlement, and the process can result in additional <br />administrative costs for the applicant and additional staffing needs for the City. The proposed <br />amendments to Article 41.9 would extend the initial entitlement period to three years, plus allow up <br />to two 1-year extensions at the discretion of the Zoning Administrator, for a total of 5 years. A written <br />request must be submitted to the Zoning Administrator for the first 1-year extension, while the <br />8.B. - Page 3 of 212 <br />318
The URL can be used to link to this page
Your browser does not support the video tag.