My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Sprinturf, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Sprinturf, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:47:14 AM
Creation date
7/17/2026 11:46:37 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Griffin-Bechet Synthetic Turf Field Project at 1400 Roosevelt
RMP File Number
304.5
Date
6/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. <br />Bid items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless <br />words are specifically requested. <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />BID FORM 004113-2 <br />GRIFFIN - BECHET SYNTHETIC TURF FIELD PROJECT <br />Estimated <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Item Cost <br />General Conditions: Mobilization, <br />1 <br />Demobilization, Traffic Control, <br />1 <br />Lump <br />$ 25,000.00 <br />$ 25,000.00 <br />Construction Layout, Notification, <br />Sum <br />Permitting, and Other Incidentals <br />2 <br />Stormwater Pollution Prevention & <br />1 <br />Lump <br />$10,040.00 <br />$ 10,040.00 <br />Surveying <br />1 <br />Sum <br />$81,605.00 <br />3, <br />Site Preparation and Demolition <br />Sump <br />$ 81,605.00 <br />4. <br />Fine Grading, including Stringlining <br />1 <br />Sump <br />$ 6,500.00 <br />$ 6,500.00 <br />5. <br />Additional Drainage Improvements <br />1 <br />Sum <br />$ 57,785.00 <br />$ 57,785.00 <br />6 <br />Synthetic Turf Surfacing, including all <br />139,700 <br />Square <br />$ 5.59 <br />$ 781,021 <br />field markings <br />Feet <br />7. <br />Drainage / Shock Pad Replacement, <br />10,000 <br />Square <br />$ 3.26 <br />$ 32,605.00 <br />As -Needed <br />Feet <br />8 <br />Project Closeout Documents and <br />1 <br />Lump <br />$ 5,000.00 <br />$ 5,000.00 <br />Red -Lined As-Builts <br />Sum <br />Total Base Bid <br />$ 999,556.00 <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />BID FORM 004113-2 <br />GRIFFIN - BECHET SYNTHETIC TURF FIELD PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.