Laserfiche WebLink
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. <br />Bid items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless <br />words are specifically requested. <br />Item Description <br />General Conditions: Mobilization, <br />1 Demobilization, Traffic Control, <br />Construction Layout, Notification, <br />Permitting, and Other Incidentals <br />2 Stormwater Pollution Prevention & <br />Surveying <br />3. 1 Site Preparation and Demolition <br />4. 1 Fine Grading, including Stringlining <br />5. ' Additional Drainage Improvements <br />6 Synthetic Turf Surfacing, including all <br />field markings <br />7. Drainage / Shock Pad Replacement, <br />As -Needed <br />ti Project Closeout Documents and <br />Red -Lined As-Builts <br />Estimated <br />QuantityUnit Unit Price Total Item Cost <br />1 S m $ 25,000.00 $ 25,000.00 <br />1 Lump $10,040.00 $ 10,040.00 <br />1 Sum <br />1 Sump $81,605.00 $ 81,605.00 <br />1 Sump $ 6,500.00 $ 6,500.00 <br />1 Lump ! Sum I $ 57,785.00 f $ 57,785.00 <br />139,700 Square $ 5.59 $ 781,021 <br />Feet <br />10,000 Square $3.26 $ 32,605.00 <br />Feet <br />1 Sump $ 5,000.00 $ 5,000.00 <br />Total Base Bid 1 $ 999,556.00 <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />BID FORM 004113-2 <br />GRIFFIN - BECHET SYNTHETIC TURF FIELD PROJECT <br />